Installation of Glazed Aluminum Curtain Wall & Composite Cladding

Installation method statement for Curtain Wall

You can find a very good method statement on this page for the installation of Glazed Aluminum Curtain Wall, Skylight & Composite Cladding works. Installation will be carried out in accordance with project specifications and approved shop drawings. MEP clearance shall be

2018
Sep
4

PMC Project Manager Roles & Responsibilities

Project Manager Responsibilities

TYPICAL PROJECT RESPONSIBILITIES FOR A PROJECT MANAGEMENT COMPANY: THE PROJECT MANAGER The Project Manager shall perform the Services strictly in accordance with the skill, care and diligence reasonably to the expected of a professional international project management consultant experienced in the provision

2018
Sep
1

Concrete Reinforcement Standard Requirements and Specifications

Reinforcement-Bars-requirement-sizes-and-weight

All reinforcement for use in the permanent works shall be specified on the drawings and shall comply with the Standards specified below. Deformed bars shall have Type 2 bond classification. BS or American Standards are applicable as mentioned but not limited to the

2018
Aug
31

Loading Platform Erection, Assembling and Installation Method Statement

Loading-Platform-Construction-Method-Statement

The Scope of this method statement covers all operations and associated activities involved in safe and efficient erection and construction of Loading Platforms including assembling and installation for efficient and effective utilization of Platforms in execution of project works. Following tools /

2018
Aug
19

Method Statement For Installation & Erection Of Building Hoist

Method statement for installation of hoist for construction of building

Hoist is a Rack and Pinion lift that is useful on construction site for transportation of personnel and materials. It is installed and dismounted conveniently and can grow as high as the building grows in height. Hoist has reliable electrical and mechanical

2018
Aug
17

Method Statement for Cementitious and Reactive Waterproofing Works

method statement for Cementitious Water proofing

The aim of this Method Statement is to provide and maintain effective quality control procedures and to execute the work in compliance to standard and good practice at all stages and activities for Cementitious and Reactive Waterproofing for Floor and Walls of

2018
Aug
16

Demolition Method Statement for Building Structures or Services

Demolition requires very careful and safe method in order to make sure that persons involved and other related parties are protected from any hazards. Demolition may affect the public, workers and adjacent structures. Therefore a well defined procedure is necessary that will