Below is very brief road construction work method statement that outlines the complete process from laying the sub base to the laying of asphalt to achieve final product or outcome. The scope for pavement for the road construction consists of sub-base of
Read Complete Method
The purpose of this roadworks method statement is to describe the activities, sequence and methods that are mandatory for carrying out the standard placement of subbase and road base for a project. The sequence of the road work activities shall remain in three
Read Complete Method
ACCEPTABLE BID PROCEDURES FOR BMS SYSTEM It is the intent of this specification to define a state-of-the-art distributed computerized software Integrated Building Management and Control System which is user friendly, has known reliability, is extremely responsive, and which is to be designed,
Read Complete Method
Below sequence of operation is for single zone Variable Volume type recirculating Air Handling Units AHU’s. The system shall be variable volume package Fresh Air Handling Unit. The covering of the sequence shall consist of: Supply Side coverage of scope Intake motorized damper Panel
Read Complete Method
When off loading, the drainage pipe shall be lowered to the ground either manually or with crane. Timber supports of at least 3” wide shall be placed beneath the pipes with spacing not greater than 2 mtrs. Closer supports will be required
Read Complete Method
Plastic electrical pvc conduits are common item which is useful for electrical wiring using pvc pipe. Since these electrical conduits are not much stronger as compared to metallic GI conduits therefore need proper handling and storage. Plastic electrical conduit pipes while unloading
Read Complete Method
Before starting the commissioning of Fire Alarm System, make sure that system installation is complete and approval is available. Verify the absence of unwanted voltage between circuit conductors and ground. Test all conductors for short circuits using an insulating testing device. With
Read Complete Method
This mechanical hvac method statement covers the installation of GI ductwork. Procedure defines the method used to ensure GI ducting installation has been carried out as per contract requirements and best practices. The method statement gives details of how the work will
Read Complete Method