2014
Aug
7
Method Statement for Testing & Commissioning Of Foam System
Before commissioning the foam system the following shall be ensured. The system has been checked against the approved installation drawings. The pressure testing of the pipes are completed. The installation of foam bladder tank, Deluge valve, Ratio Flow Controller, Isolation valves, associated pipe