Aluminum Mobile Scaffolds Method of Use Safety Hazards and Risk Assessment

This method provides you guidelines for the safe use of aluminum mobile scaffolds and standard instruction applies to all applications where people are using aluminium mobile scaffold towers. Overall project manager and HSE manager are responsible for the implementation of this standard safety procedure. The use of lightweight aluminium mobile scaffold towers on construction sites… Read More »

Method Statement for Reinforcement Works for Footing, Strap Beam, Raft, Slab & All Structural Concrete – Steel Fixing

The purpose of this method statement for reinforcement works is to lay down the systematic procedures for the various activities required for installation of reinforcement bars to ensure that all works are carried out in accordance with the approved shop drawings, bar bending schedule and project specifications. This method of statement covers the general procedures… Read More »

Welding Method Statement Prerequisites

There are many different welding processes, but the most commonly used in the construction industry are gas welding and electric arc welding. In order to ensure that all welding works takes place in a safe manner, the suitability of the following should be ensured: A-  The Arc welders B-   The working welding equipment C-   The… Read More »

Automatic Transfer Switch & Bypass Isolation Switch Testing & Commissioning

The purpose of this electrical method statement is to outline the sequence & method of Testing & Commissioning of Automatic transfer & Bypass isolation switch. This procedure is to be read in conjunction with relevant ATS operators manual and User’s guide. By following this procedure contractor shall ensure that the method used for testing and… Read More »

Underground Piping Fabrication and Laying Method Statement

Purpose of this mechanical work procedure is to provide guide lines to carry out underground piping fabrication and laying and to ensure that proper quality control and documentation are maintained at project site. The scope of this procedure covers fabrication, installation and relevant inspection for all underground piping works including relevant civil works at the… Read More »

Building Management System BMS Installation Testing and Commissioning Method Statement

Below is a precise and best method of statement that is applicable for installation, testing & commissioning of BMS building management system in accordance with the specified standards and regulations in project specifications. The scope of works includes the delivery to site, installation, testing & commissioning of the BMS system as described in the project… Read More »

Method Statement for Piping Fabrication and Installation

This document covers the sequence of activities for Fabrication, Erection and Installation procedure for Metallic Piping (Carbon Steels, Stainless Steels, Nickel Alloys) systems and to ensure the compliance to the above activities with the contractual applications, applicable standards and HSE requirements. Below is list of necessary equipment’s and tools for the piping fabrication and installation… Read More »

Roof Cladding | Wall Cladding Method Statement

Below is a precise method statement for installation of insulated roof cladding and wall cladding installation. List of necessary plant, machinery, materials and tools: Lifting Equipment 50 ton mobile crane (2 No.) 25 ton mobile crane (4 No.) 3 ton telescopic boom loader Scaffoldings Man lift Electrical equipment Generator Drill (110 volts) Screw gun Electrical… Read More »