2019
Jun
28

Method Statement for Flexible Pavement Asphalt Driveway Rehabilitation and Road Resurfacing

flexible pavement rehabilitation

The purpose of this method statement is to describe steps for flexible pavement that can also include asphalt driveway rehabilitation and road resurfacing. The sequence of the work to be carried out shall be as follows: Resurfacing Works Partial Reconstruction Works Total

2019
Jun
15

Standby Diesel Generator Installation Instructions

standby diesel generator installation instruction

Before the installation of standby generator the equipment shall be inspected and checked against the relevant general arrangement drawing, approved material submittal. Doors and Panels shall be checked to ensure proper opening and closes. Generator rating, name plate details, Breaker ratings, protection

2019
Jun
5

Project Site Environmental Health and Safety Management Organization Structure

Project Site Environmental Health and Safety Management Organisation Structure

In addition to the basic project environmental health and safety management organization structure, the organization can setup an independent project safety committee to carry out the following functions: Discuss safety policies and recommend adoption of these by management. Identify unsafe conditions and

error: Content is protected !!