2019
					Jun
					
					
					
					
					
					28
				Method Statement for Flexible Pavement Asphalt Driveway Rehabilitation and Road Resurfacing
 
		
					The purpose of this method statement is to describe steps for flexible pavement that can also include asphalt driveway rehabilitation and road resurfacing. The sequence of the work to be carried out shall be as follows: Resurfacing Works Partial Reconstruction Works Total