Sprinkler System Installation Procedure

Pre-construction meeting will take place to brief all requirements on the implementation of this firefighting method statement. All operatives will attend the Project Safety induction prior to commencing work on site. As a minimum requirement, daily toolbox talk will explain and discuss: The day’s work is for the team and individuals planned sequence of work… Read More »

Construction Project Quality Plan Basic Requirements & Template

Below are basic sections that can form a good project quality plan for construction sites. 1. Introduction Construction Quality Control Plan (CQCP) for any kind of project is implemented to ensure that construction procedures are performed in compliance with the plans and specifications under the contract requirements. The CQCP provides means to maintain effective quality… Read More »

Manual Handling Manual Lifting Techniques and Safety Procedure

This health and safety procedure provides guidance and direction in identification of potential manual handing and lifting issues and prevention measures to help eliminate the risk of injury. Procedure addresses safety instructions for both projects and offices of the company, additional control measures may be required depending on project and local government requirements. Manual Handling… Read More »

Pressure Vessel Steel Tank Fabrication Welding General Steps

Below method covers the erection of the tank by joining the top and bottom portion through the welding procedure. Prior to the commencement of the works the lifting supervisor must ensure that all site personnel are adequately briefed on the contents of safework method statement. This safety briefing shall take the form of a short… Read More »

General Civil Work Method Statement for Roads & Building Construction

Setting Out the Layout Refer to the final layout drawing prepared with reference to the actual demarcation, set back adjustments, final levels and other development works. Check if the site is cleaned and leveled properly by cutting or filling. Start the layout with the help of ‘Total Station’ or any other survey instrument as given… Read More »

Los Angeles Abrasion Test Procedure

The purpose of this procedure is to determine the abrasion of the given aggregate sample for road works. For conducting this test you shall need Los Angles Abrasion Machine, Steel balls, Weighing balance and sieves of different sizes i.e. 20, 12.5, 10, 1.7 mm. Due to the movement of traffic, the road stones used in the… Read More »

Method Statement for Installation of Thermal Insulation on Pipes

Below is a detailed method statement for thermal insulation application on pipes, fittings and equipment connections. Calcium silicate insulation is used for thermal insulation of indoor piping and fittings. Perlite insulation is often used where water entering an insulation system may cause corrosion problems or process problems, for example the outdoor piping, fitting and equipment.… Read More »

Method of Statement for Protection Screed of Waterproofing Membrane

This civil work method statement describes the brief procedure and responsibilities of site personnel who are involved in the work for protection screed of waterproofing membrane. Project manager is overall responsible for the implementation of this method during the project civil works related to Screeding works. The site engineers are responsible for proper execution, arrangement,… Read More »