Inspection and Test Requirements for In-Situ Concrete Placement

This procedure covers checks and quality control requirements for carrying out in-situ concrete operations. Daily concrete requirements shall be provided to the RMC supplier including quantity, mix  details, workability time, delivery rate and access arrangements. Site Engineer shall ensure that checks on the following activities take place using checklist for In-Situ Reinforced Concrete. Formwork Requirements… Read More »

Steel Bar Rebar Reinforcement Cutting Bending and Fixing Procedure

The scope of this procedure covers the control required for cutting, bending and fixing of steel reinforcement bars, including scheduling and dimensioning. All fixing, cutting and bending of reinforcement bars will be carried out in accordance with the specification detailed in the specific project contract documentation. In any circumstances where specifications are not provided or… Read More »

Aggregate Impact Test to Find Aggregate Impact Value

The aim and purpose of aggregate impact test is to determine the impact value of the given aggregate which is to be used in road works. Toughness is the property of a material to resist impact. Due to traffic loads the road stones are subjected to the pounding action or impact and there is possibility… Read More »

Standard Road Maintenance Routine Requirements

The works mentioned in this Section shall apply to maintenance of road and shall be carried out manually or by machinery in such a way that the quality of end product meets the specified requirements. Whenever the Specification is not clear, good engineering practice shall be applied to the satisfaction of the consulting engineer. This… Read More »

Explosive Power Tools Operation Safety Instructions

The purpose of this safety procedure is to provide the safety requirements for the use of power actuated fastening tools. This Instruction applies to all applications where power actuated tools are used on a project. Always refer to the power tool operating manual and cartridge operating manual. Hazard Identification and Risk Assessment The introduction of… Read More »

Concrete Curing Method of Statement

The scope of this procedure covers methods of concrete curing to achieve specified strength and durability parameters of concrete. Procedure for concrete curing on a project site will vary depending on the type, exposure, location and design mix. It is advised to check the specification and obtain the approval of the Consultant prior to the… Read More »

Drainage Accessories Installation Method of Statement

Below is a precise method of statement that describes the procedure for installation of Drainage Accessories. This document defines the methods to be used to ensure that the plumbing works to be conducted at site are in compliance with the approved designs and approved material submittals. Prior to installation of drainage accessories, the supervisor  and… Read More »

Standard Procedure for Management of Construction Equipment Project Plant Assets

This procedure describes standard procedure for Management of Construction Project Plant Assets. Project plant coordinator is overall responsible for the implementation of this procedure on the construction project. The asset management procedures describes the minimum requirements. Organization will only purchase assets when suitable hire/rental equipment is not available in the market place, and where an… Read More »