Roadworks

This section provides method statements and other relevant documents related to the road works. We have combined all method statements in editable word formats which you can also download from THIS LINK.

Road work Binder Course Spreading with Asphalt Paver Machine

Method Statement for Road Construction

This roadwork method statement describes work methodology for road construction covering the activities from subgrade to asphalt work. All personnel working at site shall have full knowledge and expertise in the excavation, backfilling, compaction and road testing process. Occupational health and safety program shall be properly communicated and implemented. Everyone should be aware of the

Method Statement for Road Construction Read More »

Roadworks
Embankment Construction Method Statement Including Soil Stabilization & Granular Sub Base

Embankment Construction Method Statement Including Soil Stabilization & Granular Sub Base

Below is a precise roadwork method statement that covers construction of embankment including soil stabilization and sub base preparation, with material obtained from approved borrow areas or suitable material obtained from roadway excavation and drain excavation etc. The embankment construction work shall be preformed in compliance with, contract agreement, Ministry of Road Transport & Highway

Embankment Construction Method Statement Including Soil Stabilization & Granular Sub Base Read More »

Roadworks
Method Statement for Dry Lean Concrete - Roadworks

Method Statement for Dry Lean Concrete – Roadworks

Below road works method statement covers the construction of Dry Lean Cement concrete sub-base for cement concrete pavement in accordance with requirement of roadwork specifications in conformity with the lines, grades and cross sections shown on the drawings and or as directed by the consulting engineer. The road construction shall be done in compliance with

Method Statement for Dry Lean Concrete – Roadworks Read More »

Civil Works Method Statements, Roadworks
Method Statement for Wet Mix Macadam (WMM) on Granular Sub Base

Method Statement for Wet Mix Macadam (WMM) on Granular Sub Base

This macadam work method statement covers laying and compacting clean, crushed, graded aggregate and granular materials premixed with water into a dense mass on a prepared Granular Sub base Course to specified lines, grades and cross sections as shown in drawings, subject to a minimum thickness of 75 mm and max. of 200 mm. References

Method Statement for Wet Mix Macadam (WMM) on Granular Sub Base Read More »

Civil Works Method Statements, Roadworks

Mobile Heavy Equipment Recovery Standard Procedure

The purpose of this procedure is to safely recover mobile equipment that may have been bogged, overturned, suffering from mechanical/structural failure, slipped over an edge or into a culvert, or similarly immobilized. It provides instruction for recovery operations that require the use of heavy mobile recovery equipment, although some of the general safety principles may

Mobile Heavy Equipment Recovery Standard Procedure Read More »

Civil Works Method Statements, Roadworks