Standard Road Maintenance Routine Requirements

Road Pavement Construction Inspection Checklist

The works mentioned in this Section shall apply to maintenance of road and shall be carried out manually or by machinery in such a way that the quality of end product meets the specified requirements. Whenever the Specification is not clear, good

2021
Nov
9

Standard Procedure for Management of Construction Equipment Project Plant Assets

Standard Procedure for Management of Construction Equipment Project Plant Assets

This procedure describes standard procedure for Management of Construction Project Plant Assets. Project plant coordinator is overall responsible for the implementation of this procedure on the construction project. The asset management procedures describes the minimum requirements. Organization will only purchase assets when

2021
Oct
25

Road Maintenance Standard Requirements During Defect Liability Period

Possible Cause of Road Crack and Defect - Road Maintenance Inspection Guide

The road maintenance contractor shall be responsible for undertaking all routine maintenance of the existing road and all bridges on the road from the day the road is officially handed-over to the client until the issue of Defects Liability Certificate by the

2020
May
6

Possible Causes of Road Crack and Defect – Road Maintenance Inspection Guide

Possible Cause of Road Crack and Defect - Road Maintenance Inspection Guide

Below you can find some major causes of road crack and road defects. The page also provides what are the effects if these road defects are not properly addressed. Alligator Cracking Alligator cracking is a series of interconnecting cracks creating interconnected patterns

2020
Apr
24

Road Pavement Construction Inspection Checklist

Road Pavement Construction Inspection Checklist

General road construction site inspection checks: Contractor has all necessary permits to work in road where applicable, i.e. Construction Permit, Insurance, Bonding etc. available. Safety to public considered: (barricades, covered walkways, etc. provided) Barricades available around excavations in street. Barricades available around

2019
Jun
28

Method Statement for Flexible Pavement Asphalt Driveway Rehabilitation and Road Resurfacing

flexible pavement rehabilitation

The purpose of this method statement is to describe steps for flexible pavement that can also include asphalt driveway rehabilitation and road resurfacing. The sequence of the work to be carried out shall be as follows: Resurfacing Works Partial Reconstruction Works Total