Method Statements

This is our main category that covers all SWMS related documents. If you visit this page you can access hundreds of safe work method statements either in readable or downloadable formats.
Alternatively you can visit our method statements store that offer more than the method statements i.e. ITP, Checklist, QCP and Risk Assessments all in editable formats.
The documents are ready to submit for client approvals after just adding some references and logos etc.

Fire Pump Installation Method Statement

Below is a precise method statement for fire pump installation, each project will have its own specific method of statement for installation of fire pump. Follow the manufacturer’s instructions while installing the fire pump. Pump shall be stored on a flat surface in well-ventilated storage area. Inlet and outlet flange blanks shall not be removed […]

Fire Pump Installation Method Statement Read More »

Construction Method Statements, Method Statements, Plumbing Method Statements

Testing & Commissioning Procedure for Start Up of Diesel Generator Genset

General Requirements Batteries, fuel & auxiliary power must be isolated before carrying out initial inspection. Ensure that the control switch is in the OFF position and emergency switch is pressed. Ensure that the panel has the correct fascia and labels. Note: All test sheets containing test values shall be forwarded to concern parties for records All

Testing & Commissioning Procedure for Start Up of Diesel Generator Genset Read More »

Electrical Method Statements, Testing & Commissioning
Method Statement For Installation Of CCTV Camera Security System

CCTV Camera Installation

Below is a precise method statement for the installation of CCTV camera system on a project. Contractor shall make sure that the installation is done as per project specifications, approved drawings and applicable regulatory requirements. List of necessary Tools Following tools shall be required to perform the installation of CCTV system. MATERIAL HANDLING & STORAGE:

CCTV Camera Installation Read More »

Electrical Method Statements

Method Statement for Testing & Commissioning of Cooling Towers

The scope of this method statement is to determine the thermal capability of water cooling towers. Its main purpose is to describe instrumentation and procedures for the testing and performance evaluation of water cooling towers. It is recognized that the data limitations specified throughout this Testing & Commissioning Procedure represent desired conditions which may not

Method Statement for Testing & Commissioning of Cooling Towers Read More »

HVAC Method Statements, Testing & Commissioning
Method Statement for Fire Fighting System Installation Testing & Flushing

Fire Fighting Piping System Installation Method Statement

Below is a detailed method of statement for the installation of firefighting piping system. Before starting the work and implementing the fire fighting pipe installation method statement make sure all relevant drawings and details are approved and available for the site team. Necessary materials: Necessary Tools: Material Storage and Handling All material while unloading shall

Fire Fighting Piping System Installation Method Statement Read More »

Fire Suppression System, Method Statements, Piping Method Statements, Plumbing Method Statements

Laboratory Gas Piping System Testing & Commissioning Method

This method statement covers all processes related to Testing & Commissioning of Laboratory Gas System, procedure is to be read in conjunction with the relevant ITP, outlining the responsibility and the quality verification to be performed by various parties. Project manager is overall responsible to make sure that all installations and testing activities are done

Laboratory Gas Piping System Testing & Commissioning Method Read More »

Method Statements, Piping Method Statements, Testing & Commissioning