Method Statements

This is our main category that covers all SWMS related documents. If you visit this page you can access hundreds of safe work method statements either in readable or downloadable formats.
Alternatively you can visit our method statements store that offer more than the method statements i.e. ITP, Checklist, QCP and Risk Assessments all in editable formats.
The documents are ready to submit for client approvals after just adding some references and logos etc.

Drainage Accessories Installation Method of Statement

Below is a precise method of statement that describes the procedure for installation of Drainage Accessories. This document defines the methods to be used to ensure that the plumbing works to be conducted at site are in compliance with the approved designs and approved material submittals. Prior to installation of drainage accessories, the supervisor  and […]

Drainage Accessories Installation Method of Statement Read More »

Plumbing Method Statements

Procedure for Repairing Damaged Outer Jacketing of Cables by Wraparound Heat Shrinkable Sleeves

SCOPE OF WORK: This Method Statement describes the procedure for repairing the damaged outer jacketing of cables using wrap around heat shrinkable sleeves. TOOLS Cable preparation tools Cable manufacturer approved solvent Clean, lint free clothes Burning Torch Electrician’s tape Installation tools MATERIALS REQUIRED: The wrap around heat shrinkable cable sleeves used shall be as per approved

Procedure for Repairing Damaged Outer Jacketing of Cables by Wraparound Heat Shrinkable Sleeves Read More »

Construction Method Statements, Electrical Method Statements, Method Statements
Chilled Water Pressurization Unit Testing & Commissioning Method Statement

Sequence of Operation for Chilled Water Pumps, Pressurization Units & Chemical Treatment System

Below is detailed sequence of operation for Chilled Water Pumps, Pressurization Units & Chemical Treatment System. Primary/Secondary Chilled Water Pumps The secondary chilled water pump (SCHWP) sets will be controlled through VFD drives to maintain the desired system differential pressure. A minimum of 3 differential pressure transducers will be connected to the DDC controllers of

Sequence of Operation for Chilled Water Pumps, Pressurization Units & Chemical Treatment System Read More »

Building Management System, HVAC Method Statements
Pan Tilt & Zoom or PTZ CCTV Camera

CCTV Camera Testing & Commissioning Procedure

The purpose of this method statement is to specify the detailed requirements and procedure for testing & commissioning of installed CCTV System at a project in accordance to the specification and manufacture’s recommendation to reach the required quality and satisfying the requirements of the client. Below is the list of equipment that shall be used

CCTV Camera Testing & Commissioning Procedure Read More »

Electrical Method Statements, Testing & Commissioning

Sequence of Operation for Close Control Unit CCU

Close Control Unit (CCU) Sequence Of Operation Server rooms shall be provided with DX type Close Control Units. The system shall be constant volume package Close Control Unit (CCU). Electrical Rooms, IDF, MDF Rooms etc. The unit shall consist of: Panel (Pleated) Filter Water Steam Humidifier Direct Expansion (DX) Cooling Coil & Condenser Supply Fan

Sequence of Operation for Close Control Unit CCU Read More »

Building Management System, HVAC Method Statements

BMS Sequence of Operation SOO for HVAC Systems

Below is a typical sequence of operation for the HVAC system & equipment’s like packaged units, Fan Coil Units, Split Units, Extract fans, Kitchen Extract fans and general ventilation fans etc. This sequence of operation is demonstrated by using the BMS building management system software during testing & commissioning of the project. Below information is

BMS Sequence of Operation SOO for HVAC Systems Read More »

Building Management System, Electrical Method Statements, HVAC Method Statements

Sequence of Operation for Electrical, Low Current & ELV Systems

Below is sequence of operation for different systems which is configured for building management system during testing and commissioning phase of a project. This page will help commissioning engineers to understand how the sequence of operation shall be checked. Fire Alarm Panels Sequence Location: Fire Alarm Panels: Various Locations (refer to Fire Alarm Layout) Each Fire

Sequence of Operation for Electrical, Low Current & ELV Systems Read More »

Building Management System, Electrical Method Statements
error: Content is protected !!
Scroll to Top