Category Archives: Plumbing Method Statements

Vertical Turbine Firefighting Pump Installation

Dear engineers we are giving below a complete method statement that can be helpful for the installation of vertical turbine firefighting pump for any project. Before start of the work ensure that all latest approved related documents like drawings are available for reference. All installation at site shall be based on approved shop drawings, specifications,… Read More »

Drainage Pipe Installation & Hydrostatic Testing Method of Statement

When off loading, the drainage pipe shall be lowered to the ground either manually or with crane. Timber supports of at least 3” wide shall be placed beneath the pipes with spacing not greater than 2 mtrs. Closer supports will be required for sizes below 160mm. Drainage pipes shall not be stored under direct sunlight… Read More »

Method Statement for Installation of Sump Pump

Pump shall be stored on a flat surface in well ventilated storage area. Inlet and outlet flange blanks shall not be removed until ready for connection to pipe work. Manufacturer’s instructions shall be strictly followed as applicable. If the pumps are stored for longer periods the shaft shall be periodically rotated and lubricated, if required. The… Read More »

How to Install Drainage Pipe System?

Below procedure for installation of drainage pipe is very useful for all kind of projects and buildings of any size. First step is the procurement of pipes after which these shall be delivered on the site. When off-loading, pipes shall be lowered to the ground either manually or with crane. Timber support of at least… Read More »

Fire Fighting Piping System Installation Method Statement

Below is a detailed method of statement for the installation of firefighting piping system. Before starting the work and implementing the fire fighting pipe installation method statement make sure all relevant drawings and details are approved and available for the site team. Necessary materials: Sprinkler pipes to ASTM A536 GR `B’ Zone Control Valve Test… Read More »

UV Sterilization System Testing and Commissioning Method Statement

Ultraviolet UV Sterilization System are useful in many water purification systems to disinfect and control bacteria. Ultraviolet or UV energy is found in the electromagnetic spectrum between visible light and x-rays and can best be described as invisible radiation. UV light occurs with a wavelength ranging from 200 to 390 nanometers (nm). The most effective… Read More »

Cartridge Filters UV Sterilization Unit and Chlorine Dosing System Installation

Before starting the site installation work domestic water treatment system, ensure all civil works are completed for the area of installation, and civil clearance is obtained from respective authorities to proceed further. Prior to start the installation, refer to the approved shop drawings and BOQ related to the area of installation and ensure that required… Read More »

Method Statement for Water Tank Installation – GRP Water Tank

Below is a precise and comprehensive method statement for water tank installation (GRP Water Tank). The water tank installation shall be carried out by specialist contractor based on the following steps and shall be done in accordance with the approved shop drawings, specifications and approved material submittal. Installation contractor shall properly coordinate with the civil… Read More »