Category Archives: Plumbing Method Statements

Preventive Maintenance & Breakdown Maintenance Plans and Procedures [Download]

If you are looking for preventive maintenance & breakdown maintenance program, plans, schedules and procedures then this is right place. We are providing editable method statements and procedures that can help you for conducting the planned maintenance of electrical and mechanical equipment’s and systems. Preventive maintenance is an essential part of any facility management works.… Read More »

Firefighting Sprinkler and Standpipe System Testing and Commissioning Method Statement

This method statement procedure covers the Testing and Commissioning of sprinkler and firefighting standpipe systems installed at project, this will also ensure proper workmanship and that the work conforms to contract documents and applicable NFPA regulations. Commissioning manager will have the all the responsibility for the execution  of the Testing and Commissioning  activities, quality  and… Read More »

Method Statement for Installation of Fire Protection Services

This method statement describes in detail the installation of fire protection services at any project. The procedure covers the following activities that are also supported by the diagrams and illustrations. Fire Protection Riser Pipe Installation Rigid Coupling Installation Mechanical-T Installation Flexible Coupling Installation Drop In Anchor Installation Pipe Hanger Installation Prepare delivery schedule and check… Read More »

Butterfly Valve Installation and Maintenance Procedure

This method is for installation and maintenance of wafer type butterfly valve or lug style butterfly valve with a cast iron body construction, SS stem and disc and either EPDM, BUNA-N or Viton liners. Although the procedure is specifically provided for bi-Torq butterfly valves but is useful for any other such type of valves. General… Read More »

Method of Statement For Cast-in Pipeworks (Mild Steel or Ductile Iron)

This pipeworks procedure is applied to all the cast-in pipeworks (mild steel or ductile iron) for the project site in water treatment facility. The contents or procedures provided in this document are based on the general good water industry practices and manufacturer standard recommendation. The installation work contractor shall follow this procedures strictly unless otherwise… Read More »

Method Statement for Installation and Maintenance of Strainer

Strainers are installed to prevent foreign matter e.g. scale and dirt causing damage to pipeline equipment. Service temperature and pressure indicated on the identification plate or body marking should not be exceeded. Crane strainers have not been designed as fire safe pressure equipment. Strainers must be installed into a well-designed system and it is recommended… Read More »

Vertical Turbine Firefighting Pump Installation

Dear engineers we are giving below a complete method statement that can be helpful for the installation of vertical turbine firefighting pump for any project. Before start of the work ensure that all latest approved related documents like drawings are available for reference. All installation at site shall be based on approved shop drawings, specifications,… Read More »

Drainage Pipe Installation & Hydrostatic Testing Method of Statement

When off loading, the drainage pipe shall be lowered to the ground either manually or with crane. Timber supports of at least 3” wide shall be placed beneath the pipes with spacing not greater than 2 mtrs. Closer supports will be required for sizes below 160mm. Drainage pipes shall not be stored under direct sunlight… Read More »