Method statement for building construction is very important for successful completion of the construction projects. HVAC is a major discipline of any project and MEP engineers are using method statements for air conditioning works. Method statements include the ducting works, sleeves, chilled water piping, pipe welding, flushing of pipes and installation of HVAC equipment’s. In addition to installation method statements the requirements is also for testing and commissioning method statements. As part of method statement there are always, risk assessments, inspection and test plans ITP and inspection checklists.

Below you can browse our collection of method statement for HVAC building construction works free of cost. If you are looking for editable files in Word format that you can also use for submission then you may need to visit our method statement download center.
HVAC Building Construction Method Statements

Download Method Statement For Installation of Air Separators

Download Method Statement For Installation of Air Separators  Download Package Contains the Method Statement + Checklist for Installation + Inspection & Testing Plan + Risk Assessment You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients. Below is the list of files that are included… Read More »

Download Method Statement for Installation of H2S Scrubbers System

Download Method Statement For H2S Scrubbers System  Download Package Contains the Method Statement + Checklist for Installation + Inspection & Testing Plan + Risk Assessment You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients. Below is the list of files that are included in download… Read More »

Download Method Statement For Testing & Commissioning Of Smoke Management System

Download Method Statement For Testing & Commissioning Of Smoke Management System  Download Package Contains the Method Statement + Checklist for Testing &  Commissioning + Inspection & Testing Plan + Risk Assessment You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients. Below is the list of… Read More »

Sequence Of Operation For Variable Volume Type Fresh Air Handling Units

Sequence of operation is very important part of testing and commissioning of equipment’s. This becomes more important when matter of mechanical systems is considered. SOA is technical document that is developed based upon the mechanical systems performance and operation requirements. Sequence of operation is part of building management system BMS submission documents. BMS covers the… Read More »

Sequence Of Operation For Constant Air Volume Air Conditioning System

Constant Air volume Air Conditioning System  Air Handling Units AHU’s The unit shall consist of: Supply Side Intake motorized damper Panel (Pleated) Filter Bag Filter Cooling Coil Supply Fan (with VFD) Plate Heat Exchanger Intake and discharge attenuators Wrap Around heat Pipe Sensors and controls (refer to BMS Schematic Diagram) Exhaust Side Exhaust motorized damper… Read More »

METHOD STATEMENT FOR TESTING AND COMMISSIONING OF LABORATORY AIR FLOW CONTROL SYSTEM & VENTURI VALVES

METHOD STATEMENT FOR TESTING AND COMMISSIONING OF LABORATORY AIR FLOW CONTROL SYSTEM & VENTURI VALVES  Download Package Contains the Method Statement + Checklists for Testing & Commissioning + Inspection & Testing Plan + Risk Assessment You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval… Read More »

Method Statement For Chilled Water Cleaning Flushing & Chemical Treatment

Method Statement For Chilled Water Cleaning Flushing & Chemical Treatment  Download Package Contains the Method Statement + Checklists for Cleaning, Flushing & Passivation + Inspection & Testing Plan + Risk Assessment You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients. Below is the… Read More »

Sequence of Installation for the Chiller Plant Manager CPM Field Devices

Sequence of Installation for the Chiller Plant Manager Field Devices Safety All site safety rules & regulations shall be complied with. Supervisors will deliver tool box talks, relevant to these activities to all operatives involved in the installation and shall be recorded. All operatives will be equipped with minimum personnel protective equipment; hard hat, coveralls,… Read More »