Category Archives: HVAC Method Statements

Method statement for building construction is very important for successful completion of the construction projects. HVAC is a major discipline of any project and MEP engineers are using method statements for air conditioning works. Method statements include the ducting works, sleeves, chilled water piping, pipe welding, flushing of pipes and installation of HVAC equipment’s. In addition to installation method statements the requirements is also for testing and commissioning method statements. As part of method statement there are always, risk assessments, inspection and test plans ITP and inspection checklists.

Below you can browse our collection of method statement for HVAC building construction works free of cost. If you are looking for editable files in Word format that you can also use for submission then you may need to visit our method statement download center.
HVAC Building Construction Method Statements

Welding Procedure | Arc Welding Machine

This welding procedure or Method statement describes in detail the welding process for pipe work and the welder’s qualification test procedures. This includes addressing programs for implementing commitments regarding the quality of welding works. Scope and Purpose This document outlines the method for executing welding procedure for pipe work and welding procedure qualification test for ARC Welder. This… Read More »

AC Duct Cleaning Method Statement Best for HVAC Ducts & Accessories

The purpose of this ac duct cleaning method is to remove the inert suspended matter such as foreign objects, moulds etc. HVAC duct cleaning will be done until all suspended matter and loose debris are fully removed from the ducting system. Following tools shall be arranged before starting the ac duct cleaning works of HVAC… Read More »

Testing & Commissioning Procedure for Ventilation and General Exhaust Fans

Mechanical Pre-commissioning checks for Exhaust Fans Carefully inspect the unit and check the installation with anti vibration materials is complete. Check and ensure the shipping bolts / clamps are removed. Check tightness of all nuts / bolts, screws, fasteners etc. as applicable. Check the alignment of belts and adjust the tension (where applicable). Check the ductwork connections… Read More »

Download Method Statement For Testing & Commissioning of Exhaust & Ventilation Fans

Download Method Statement For Testing & Commissioning of Exhaust & Ventilation Fans  Download Package Contains the Method Statement + Inspection & Testing Plan + Checklists for Pre Commissioning  + Checklists For Testing & Commissioning You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients.… Read More »

Method Statement For Installation & Testing Of Laboratory Gas System, Accessories & Fittings

Download Method Statement For Installation & Testing Of Laboratory Gas System, Accessories & Fittings  Download Package Contains the Method Statement + Checklists for Installation + Checklists for Testing + Inspection & Testing Plan + Risk Assessment    You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval… Read More »

Download Method Statement For Testing & Commissioning of H2S Scrubbers System

Download Method Statement For Testing & Commissioning of H2S Scrubbers System  Download Package Contains the Method Statement + Checklists for Pre Commissioning + Checklists for Commissioning + Inspection & Testing Plan + You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients. Below is the list of… Read More »

Method Statement For Installation Of Laboratory Plume Fans & Energy Recovery Coil Integrated System

Download Method Statement For Installation Of Laboratory Plume Fans & Energy Recovery Coil Integrated System  Download Package Contains the Method Statement + Checklists for Installation + Inspection & Testing Plan + Risk Assessment You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients. Below is the list… Read More »

Download Method Statement For Testing & Commissioning of Laboratory Gas System

Download Method Statement For Testing & Commissioning of Laboratory Gas System  Download Package Contains the Method Statement + Checklists for Testing & Commissioning + Inspection & Testing Plan + Risk Assessment You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients. Below is the list… Read More »