Download Method Statement For Installation of Air Separators

The installation of Air Separators shall be carried out by qualified mechanical personnel using approved materials, certified equipment, and established installation procedures.

All activities shall comply with approved shop drawings, project specifications, ASHRAE guidelines, ASME piping standards, manufacturer recommendations, and local authority requirements.

Particular attention shall be given to proper equipment location, piping alignment, support installation, air vent accessibility, pressure testing, and quality inspections to ensure efficient air removal, reduced system corrosion, improved hydraulic performance, enhanced energy efficiency, and long-term reliability of the HVAC water systems.

Download Package Contains:

  • Method Statement
  • Checklist for Installation
  • Inspection & Testing Plan
  • Risk Assessment

You only need to change project name and insert logos etc. and the same shall be ready to be submitted for approval from consultant/clients.

Below is the list of files that are included in download package.

Method Statement for Installation of Air Separators

Download Link: