Testing & Commissioning Of Fire Suppression System

The scope of method statements covers the planning, preparation, and conduct of fire suppression systems cable laying, Installation testing and commissioning. Preparation & Pre Testing & Commissioning Work Before start of testing & commissioning the completeness of the system shall be ensured

2013
Jul
31

Chilled Water Balancing For HVAC System Method Statement

The aim of chilled water balancing is to apply a disciplined procedure of adjustment to water flow rates throughout the chw system to meet the particular requirements of the design. The balancing of chilled water flow rates should be carried out to specified

2013
Jul
31

Air Balancing Procedure for HVAC System FCU AHU Exhaust Fans & Pressurization Unit

Air Balancing Procedure for HVAC System FCU AHU Exhaust Fans & Pressurization Unit

Below is a precise air balancing procedure that covers the HVAC system equipment and ducting system.  Air Balancing For Fan Coil Units Check that all automatic controls are fully commissioned and operating properly All pre-commissioning checks have been carried out Select the

2013
Jul
30

Flushing Procedure For Chilled Water System & Chemical Treatment

Flushing Procedure For Chilled Water System

Chilled water or cooling water system is mostly a closed system that requires strict monitoring and control of certain parameters. Water during circulation evaporates and it increases the suspended particle concentration, which in result creates scale formation and corrosion etc. Therefore the

2013
Jul
29

METHOD STATEMENT FOR TESTING & COMMISSIONING OF PRESSURIZATION UNIT

The purpose of this procedure is to define the step by step method to implement the correct practices for the pre-commissioning & commissioning of Pressurization Unit through the guidelines contained herein so as to ensure that the job execution complies with the

2013
Jun
9

Method Statement for Installation Of Air Handling Unit AHU & FAHU

Installation of Air Handling Units AHU & FAHU

Below is the brief method of statement for the installation and testing of air handling units i.e. AHU & FAHU. On this page you can see three major sections which are: necessary tools, installation and testing procedure Other parts should be included