If you are willing to submit a project hse plan then this page is designed in order to provide you an overview of the components of a project HSE plan. The hse or safety plan is a very important document created at
Read Complete Method
1. Purpose This method of statement describes the methodology and procedure of installation of dehumidification unit for the project, and to ensure that all concerned persons are familiar with the sequence of activities, utilization of resources, and execution of the works in
Read Complete Method
Block work is most important work for the construction of any building. Concrete blocks are very common building components that are used worldwide. There is a wide variety of size and type used within the construction industry today. Let us look at some
Read Complete Method
This method statement describes the practices and methods to be used with regards to placing, curing and defect rectification of concrete works & blinding concrete. Prior to the placing of any concrete or concrete pouring all quality checks are to be completed
Read Complete Method
Installation of sub circuit wiring Check the installation & approval of distribution board / back box either recessed or surface and termination of all conduits & trunking completed. Confirm DB reference with load schedule detail. Check all conduits as per circuits are
Read Complete Method
Below is a complete management procedure for business development, that can be used for any company by making little modifications. The procedure provides a basic structure for more inclusions depending upon the business type. Mostly marketing or business development departments are the
Read Complete Method
Fire Pump Testing and Commissioning Procedure The purpose of this procedure is to define the step by step method to implement the correct practices for the pre-commissioning & commissioning of “Fire Pumps” through the guidelines contained herein so as to ensure that
Read Complete Method
The pump operation is controlled as per the chilled water or cooling requirements and sequence of operation is automated via field control devices i.e. valves, thermometers and pressure switches etc. Pump sets are supplied mounted on a substantial fabricated base plate; the
Read Complete Method