TESTING OF CHILLED WATER PIPES & FITTINGS Care will be taken to avoid all the equipment, apparatus, devices to a pressure exceeding its prescribed test pressure as obtained from its name plate data or product catalogs. All equipment, apparatus and devices that might
Read Complete Method
The purpose of this method of statement or standard operating procedure is to define the step by step method to implement the correct practices for the pre-commissioning & commissioning of “ Chilled Water Pump” through the guidelines contained herein so as to
Read Complete Method
1. Purpose The purpose of this procedure is to define the step by step method to implement the correct practices for the pre-commissioning & commissioning of Pressurization Unit through the guidelines contained herein so as to ensure that the job execution complies
Read Complete Method
Fire Pump Testing and Commissioning Procedure The purpose of this procedure is to define the step by step method to implement the correct practices for the pre-commissioning & commissioning of “Fire Pumps” through the guidelines contained herein so as to ensure that
Read Complete Method
The objectives of the process of testing and commissioning of CCTV camera is to verify proper functioning of the equipments and system after installation, and to ensure the performance of the installed system meets the specified design intent through a series of tests and adjustments. Finally to
Read Complete Method
The pump operation is controlled as per the chilled water or cooling requirements and sequence of operation is automated via field control devices i.e. valves, thermometers and pressure switches etc. Pump sets are supplied mounted on a substantial fabricated base plate; the
Read Complete Method
Below is the method statement for the installation of fire alarm system which can be modified for different type of systems like HSSD or Vesda etc. The steps are very general and should be customized depending upon the project specific requirements, specifications
Read Complete Method
The purpose of this method statement is to define the step by step method to implement the correct practices for the pre-commissioning & commissioning of Close Control Unit through the guidelines contained herein so as to ensure that the job execution complies
Read Complete Method