Testing & Commissioning Of CCTV Camera – Method Statement

The objectives of the process of testing and commissioning of CCTV camera is to verify proper functioning of the equipments and system after installation, and to ensure the performance of the installed system meets the specified design intent through a series of tests and adjustments. Finally to capture and record performance data of the whole installation as the baseline for… Read More »

Sample Checklist for Pre Commissioning Of Chilled Water Pump

The pump operation is controlled as per the chilled water or cooling requirements and sequence of operation is automated via field control devices i.e. valves, thermometers and pressure switches etc. Pump sets are supplied mounted on a substantial fabricated base plate; the complete assembly is of a rigid construction, being intended for mounting on suitable… Read More »

Method Statement For Fire Alarm System Installation & Testing

Below is the method statement for the installation of fire alarm system which can be modified for different type of systems like HSSD or Vesda etc. The steps are very general and should be customized depending upon the project specific requirements, specifications and applicable NFPA or other standards. Installation Procedure All materials received at site… Read More »

Testing & Commissioning Of Close Control Units CCU

The purpose of this method statement is to define the step by step method to implement the correct practices for the pre-commissioning & commissioning of Close Control Unit through the guidelines contained herein so as to ensure that the job execution complies with the project requirements and serves the intended function to satisfactory level. Tools… Read More »

Testing & Commissioning Of Fire Suppression System

The scope of method statements covers the planning, preparation, and conduct of fire suppression systems cable laying, Installation testing and commissioning. Preparation & Pre Testing & Commissioning Work Before start of testing & commissioning the completeness of the system shall be ensured by physical inspections and interpreting the previously submitted and approved work inspection reports/records.… Read More »

Method Statement For Installation Testing & Commissioning Of BMS Building Management System

Scope of Work This method statement is applicable for Installation, Testing & Commissioning of BMS building management system in accordance with the specified standards and regulations in project specifications. The Scope of works includes the delivery to site, installation, testing & commissioning of the BMS system as described in the specification/contract documents and drawings. Responsibility Project… Read More »

Chilled Water Balancing For HVAC System Method Statement

The aim of chilled water balancing is to apply a disciplined procedure of adjustment to water flow rates throughout the chw system to meet the particular requirements of the design. The balancing of chilled water flow rates should be carried out to specified tolerances (which may vary for different sections of the same system and for different… Read More »

Air Balancing Procedure for HVAC System FCU AHU Exhaust Fans & Pressurization Unit

Below is a precise air balancing procedure that covers the HVAC system equipment and ducting system.  Air Balancing For Fan Coil Units Check that all automatic controls are fully commissioned and operating properly All pre-commissioning checks have been carried out Select the specified speed of the Fan Coil Set all the dampers in the grill… Read More »