Category Archives: Plumbing Method Statements

Drainage Accessories Installation Method of Statement

Below is a precise method of statement that describes the procedure for installation of Drainage Accessories. This document defines the methods to be used to ensure that the plumbing works to be conducted at site are in compliance with the approved designs and approved material submittals. Prior to installation of drainage accessories, the supervisor  and… Read More »

Method Statement For Installation Of Stainless Steel Shower Gullies and Drain Outlets

This plumbing method statement covers the nature and type of work for drainage outlets stainless steel shower gullies for the project as per site requirements. Method statement also covers frequency of which inspections are to be carried out. All documentary requirements for the installation works will be submitted for approval of consultant and this will… Read More »

Water Leak Detection System Installation Method of Statement

This “Method Statement” covers the nature and type of work for Water Leak Detection System installation as per approved material submittal and project specifications and legal requirements. MEP project manager have full authority and overall responsibility to manage, supervise, control the works and have direct responsibility for ensuring safe working practices and compliance with regulatory… Read More »

Method of Statement for Pneumatic Testing of Distribution and Process Piping System

The scope of this method of statement is to define the methodology for pneumatic pressure testing of any kind of distribution or process piping system. During the activity and works, there will be continuous communication arrangement among all parties i.e. Project Management Team, hydro/pneumatic pressure testing engineer and all personnel working on site. Below is… Read More »

Piping Work Method For Fuel Oil Pipe Fabrication Installation and Testing

The scope of this document is to describe the basic methods which shall be adopted for installation and testing of Fuel Oil Piping (ASME B31.9,”Building Services Piping”). This document also details the tools & tackles, manpower and Inspection and Test plans, to meet the requirements of applicable codes and client’s project specifications for pipe fabrication… Read More »

Painting Procedure for Firefighting and Fire Protection Piping Network

This method of statement covers the painting procedure of firefighting and fire protection pipe, fittings and accessories for any kind of construction project. The pipe painting procedure defines the method used to ensure the painting has been carried out as per contract specifications and industry best practices. It gives details of how the work will… Read More »

Method statement for the Installation of Medical Gases System in Hospital Project

This method statement covers the installation of medical gases system horizontal and vertical piping installations through all the areas in the hospital project. The medical gas pipes shall run horizontally in the main routing in the corridors. The vertical running will be through the pipes drops to the medical gases outlets, bed head units and… Read More »

Water Supply Piping Installation Method Statement – HDPE, uPVC, Copper & PPR Pipes

This plumbing method of statement covers the installation of domestic water supply piping and accessories. The procedure defines the method to ensure the installation work is done as per contract requirements, specifications and best practices. It gives details of how to carry out the work and what health and safety issues and controls are necessary.… Read More »