Construction Method Statements

Construction method statements are basic documents that a site engineer needs when he starts the construction works.
Our website provides hundreds of construction method statements related to civil, electrical, mechanical, plumbing, HVAC and firefighting disciplines.
We recommend you to visit our construction method statement online portal where you can search different documents as per your needs.

Butterfly Valve Installation and Maintenance Procedure

This method is for installation and maintenance of wafer type butterfly valve or lug style butterfly valve with a cast iron body construction, SS stem and disc and either EPDM, BUNA-N or Viton liners. Although the procedure is specifically provided for bi-Torq butterfly valves but is useful for any other such type of valves. General […]

Butterfly Valve Installation and Maintenance Procedure Read More »

Method Statements, Plumbing Method Statements, Preventive Maintenance
pipeworks method of statement

Method of Statement For Cast-in Pipeworks (Mild Steel or Ductile Iron)

This pipeworks procedure is applied to all the cast-in pipeworks (mild steel or ductile iron) for the project site in water treatment facility. The contents or procedures provided in this document are based on the general good water industry practices and manufacturer standard recommendation. The installation work contractor shall follow this procedures strictly unless otherwise

Method of Statement For Cast-in Pipeworks (Mild Steel or Ductile Iron) Read More »

Method Statements, Piping Method Statements, Plumbing Method Statements
strainer installation method statement

Method Statement for Installation and Maintenance of Strainer

Strainers are installed to prevent foreign matter e.g. scale and dirt causing damage to pipeline equipment. Service temperature and pressure indicated on the identification plate or body marking should not be exceeded. Crane strainers have not been designed as fire safe pressure equipment. Strainers must be installed into a well-designed system and it is recommended

Method Statement for Installation and Maintenance of Strainer Read More »

Plumbing Method Statements
soft landscaping method statement

Soft landscaping method statement

This method statement describes the procedures for Soft landscaping works which includes planting media, & Planting. Following equipment’s & materials shall be arranged before start of the work: Sweet soil Compost Fertilizers Plants Hand trowel Wheel barrow Tree stakes Tree ties Bobcat Shovel Crane Personal Protective Equipment: Safety Shoes Safety Helmets Hand Gloves Goggles Method Statement

Soft landscaping method statement Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements
irrigation-system-piping

Method Statement Irrigation Systems Piping

Only approved material shall be used. Delivered material shall be stored at stores and shall always be subject to client’s representative inspection. Special shaded pipe racks shall be constructed to store pipes. Fittings and irrigation materials shall be stored inside containers that will be kept closed at all times. Transportation: All materials will be transported to

Method Statement Irrigation Systems Piping Read More »

Plumbing Method Statements

Epoxy Painting Method

The aim of this Method Statement is to provide and maintain effective quality control procedures and to execute the work in compliance to standard and good practice at all stages during the execution of Epoxy Painting Works at project site. The equipment/tools involved in painting works are listed below. Paint Brushes/Roller Paint Sprayers as required

Epoxy Painting Method Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements

Plunge Column Construction Method Statement

PURPOSE This Method Statement describes the construction process of 1500 mm diameter Plunge columns construction in the project. SCOPE OF WORK The scope of work and the construction sequence for installation of permanent plunge column shall be as mentioned below: Traffic Management and Barricading SHE Measures. Design and Drawings Site Establishment Surveying Pre-excavation Boring into

Plunge Column Construction Method Statement Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements