Method Statement For Final Sub Circuit Wiring

Installation of sub circuit wiring Check the installation & approval of distribution board / back box either recessed or surface and termination of all conduits & trunking completed. Confirm DB reference with load schedule detail. Check all conduits as per circuits are

2013
Nov
4

Testing & Commissioning Of Fire Pumps

Fire Pump Testing and Commissioning Procedure SWMS

Fire Pump Testing and Commissioning Procedure The purpose of this procedure is to define the step by step method to implement the correct practices for the pre-commissioning & commissioning of “Fire Pumps” through the guidelines contained herein so as to ensure that

2013
Sep
2

Method Statement For Fire Alarm System Installation & Testing

Below is the method statement for the installation of fire alarm system which can be modified for different type of systems like HSSD or Vesda etc. The steps are very general and should be customized depending upon the project specific requirements, specifications

2013
Jul
31

Chilled Water Balancing For HVAC System Method Statement

The aim of chilled water balancing is to apply a disciplined procedure of adjustment to water flow rates throughout the chw system to meet the particular requirements of the design. The balancing of chilled water flow rates should be carried out to specified

2013
Jul
31

Air Balancing Procedure for HVAC System FCU AHU Exhaust Fans & Pressurization Unit

Air Balancing Procedure for HVAC System FCU AHU Exhaust Fans & Pressurization Unit

Below is a precise air balancing procedure that covers the HVAC system equipment and ducting system.  Air Balancing For Fan Coil Units Check that all automatic controls are fully commissioned and operating properly All pre-commissioning checks have been carried out Select the

2013
Jul
30

Flushing Procedure For Chilled Water System & Chemical Treatment

Flushing Procedure For Chilled Water System

Chilled water or cooling water system is mostly a closed system that requires strict monitoring and control of certain parameters. Water during circulation evaporates and it increases the suspended particle concentration, which in result creates scale formation and corrosion etc. Therefore the

2013
Jul
29

METHOD STATEMENT FOR TESTING & COMMISSIONING OF PRESSURIZATION UNIT

The purpose of this procedure is to define the step by step method to implement the correct practices for the pre-commissioning & commissioning of Pressurization Unit through the guidelines contained herein so as to ensure that the job execution complies with the

2013
Jun
9

Method Statement for Installation Of Air Handling Unit AHU & FAHU

Installation of Air Handling Units AHU & FAHU

Below is the brief method of statement for the installation and testing of air handling units i.e. AHU & FAHU. On this page you can see three major sections which are: necessary tools, installation and testing procedure Other parts should be included