Category Archives: HVAC Method Statements

Method statement for building construction is very important for successful completion of the construction projects. HVAC is a major discipline of any project and MEP engineers are using method statements for air conditioning works. Method statements include the ducting works, sleeves, chilled water piping, pipe welding, flushing of pipes and installation of HVAC equipment’s. In addition to installation method statements the requirements is also for testing and commissioning method statements. As part of method statement there are always, risk assessments, inspection and test plans ITP and inspection checklists.

Below you can browse our collection of method statement for HVAC building construction works free of cost. If you are looking for editable files in Word format that you can also use for submission then you may need to visit our method statement download center.
HVAC Building Construction Method Statements

Method Statement for Insulation & Cladding Of CHW Chilled Water Pipe

A precise chilled water pipe insulation procedure is given below: Check all required approved chilled water pipe insulation materials are readily available on site. Install the pipe insulation according to this method statement, taking into consideration the manufacturer instructions as per material submittal. Ensure all insulation materials are in dry condition at all times, especially… Read More »

TESTING OF CHILLED WATER PIPES & FITTINGS – HOW TO GUIDE

TESTING OF CHILLED WATER PIPES & FITTINGS Care will be taken to avoid all the equipment, apparatus, devices to a pressure exceeding its prescribed test pressure as obtained from its name plate data or product catalogs. All equipment, apparatus and devices that might be damaged by the test pressure shall be isolated, removed, bypassed or… Read More »

Fire Protection Pipes and Fittings Installation Method Statement

This method statement covers the detailed procedure for installation of Fire Protection Pipes and Fittings. Procedure also defines the method used to ensure that the pipe work and fittings installation has been carried out as per the contract specification requirements. This method will be applicable for the installation of Fire Pumps, Valves, Zone control valves… Read More »

Disinfection and Flushing of Water Mains

Purpose of this plumbing method statement is to ensure that disinfection and flushing of water mains and related pipe lines are executed safely and in accordance with the contract requirements and that all quality assurance / control activities are conducted in a systematic manner, works are inspected and conformance is verified and documented for the… Read More »

HVAC Method Statement for Grill Diffuser and Louver Installation

This hvac method statement covers the supply & installation of grilles, diffusers louvers & disc valves in line with project requirements as indicated in the approved shop drawings, reflected ceiling plans, specifications and manufacturer’s instructions. Plant and equipment required General tool box including screwdrivers Electric drill with appropriate bits Spirit level, water level Measurement tape… Read More »

Heat Exchanger Installation Testing and Commissioning Method Statement

Unless otherwise specified, all plate heat exchanger installation shall be in accordance to approved shop drawings, manufacturer instructions and contract specifications. Drawing plans, schematics, and diagrams indicate general location and arrangement of Heat Exchanger’s. Install Plate Heat  Exchanger’s as indicated unless deviations to layout are approved on coordination drawings. Plate Heat Exchanger shall be installed… Read More »

Chilled Water Dosing System Dosing Pot Installation and Testing Method Statement

The purpose of this method statement is to define the steps to implement the correct practices for the installation of chemical dosing system (pot) for chilled water piping. By following this procedure contractor shall ensure that the performance of the chemical dozing system and equipment complies with the project requirements and serves the intended function… Read More »

Fan Coil Unit FCU Testing Pre-commissioning & Commissioning Method Statement

This method statement is applicable for the Testing & Commissioning of Fan Coil Units for the project as mentioned in the project specifications & approved shop drawings. Before commencement of FCU testing & commissioning activity, the supervisor must ensure that pre-commissioning of the FCU is complete and approved. Also make sure that all Installations &… Read More »