HVAC Method Statements

Method statement for building construction is very important for successful completion of the construction projects. HVAC is a major discipline of any project and MEP engineers are using method statements for air conditioning works. Method statements include the ducting works, sleeves, chilled water piping, pipe welding, flushing of pipes and installation of HVAC equipment’s. In addition to installation method statements the requirements is also for testing and commissioning method statements. As part of method statement there are always, risk assessments, inspection and test plans ITP and inspection checklists.

Below you can browse our collection of method statement for HVAC building construction works free of cost. If you are looking for editable files in Word format that you can also use for submission then you may need to visit our method statement download center.
HVAC Building Construction Method Statements

HVAC System Volume Control & Fire Damper Installation Method Statement

HVAC System Volume Control & Fire Damper Installation Method Statement

Unless otherwise specified, all the dampers and duct accessories installation shall be according to the approved shop drawings and contract mechanical specifications. Drawings, plans, schematics and diagrams indicate general location and arrangement of ductworks, install the dampers as indicated unless deviations to the layout are approved on coordination drawings. This duct accessories and dampers installation […]

HVAC System Volume Control & Fire Damper Installation Method Statement Read More »

HVAC Method Statements

Exhaust Fan & Ventilation Fan Installation Procedure Including Accessories

This method statement covers the fan installation including accessories. The procedure defines the method used to ensure the exhaust fan installation has been carried out as per project contract requirements and best practices. It also gives details of how the mechanical work will be carried out and what health and safety requirements are implemented on

Exhaust Fan & Ventilation Fan Installation Procedure Including Accessories Read More »

HVAC Method Statements
Method of thermal insulation and Lagging for Pipe Elbow

Method Statement for Installation of Thermal Insulation on Pipes

Below is a detailed method statement for thermal insulation application on pipes, fittings and equipment connections. Calcium silicate insulation is used for thermal insulation of indoor piping and fittings. Perlite insulation is often used where water entering an insulation system may cause corrosion problems or process problems, for example the outdoor piping, fitting and equipment.

Method Statement for Installation of Thermal Insulation on Pipes Read More »

HVAC Method Statements
45° Elbow to Pipe Fit Up

Pipe Welding Work and the Welder’s Qualification Test Procedure

Below method statement describes in detail the welding process for pipe work and the welder’s qualification test procedures. This includes implementing the company commitments for achieving the best quality of welding works. The document outlines the method for executing welding process for pipe work and welding procedure qualification test for welders. This method statement covers

Pipe Welding Work and the Welder’s Qualification Test Procedure Read More »

HVAC Method Statements, Plumbing Method Statements, Steel Structure & Fabrication
Fan Powered Box FPB installation method

Method Statement for Installation of Fan Powered Box Units

Unless otherwise specified, all installation shall be in accordance to approved shop drawings and contract specifications. Drawing plans, schematics, and diagrams indicate general location and arrangement of Fan Powered Box units. Install Fan Powered Box as indicated unless deviations to layout are approved on coordination drawings. Transfer the Fan Powered Box units from the stores

Method Statement for Installation of Fan Powered Box Units Read More »

HVAC Method Statements
Air Handling Unit AHU FAHU Testing and commissioning Method Statement

Sequence of Operation for Variable Volume Type FAHU with Plate Heat Recovery

Below sequence of operation is for Variable Volume Type FAHU with Plate Heat Recovery system. The system shall be variable volume package Fresh Air Handling Unit. The scope of the unit shall consist of: Supply Side accessories Intake motorized damper Panel (Pleated) Filter Bag Filter Cooling Coil Supply Fan (with VFD) Plate Heat Exchanger Intake and discharge

Sequence of Operation for Variable Volume Type FAHU with Plate Heat Recovery Read More »

Building Management System, HVAC Method Statements, Testing & Commissioning