Step 1: Electrical Circuit Isolation
Isolate the main electrical connections and supply line from the gen-set.
Cut off the main circuit...
Construction Documentation Portal
Electrical method statement is used for safe implementation and construction of electrical works.
Before performing any electrical engineering activity one must prepare a method statement for electrical work that will describe scope of work, references, responsibilities, required materials and resources.
The main section of an electrical method statement for construction shall contain steps for installation and construction of the electrical works and components.
We are providing editable method statement swms packages, you can check a sample of free electrical method statement and after that decide about downloading the full package.
In addition to method statement you shall find inspection and testing plan, inspection/testing checklists and risk assessments for doing the work as part of method statement for electrical works.
Below you can find complete set of electrical method statements and also you can search from the top left section of this page.
In addition you can also find complete set of editable electrical method statement in the form of editable files which are in Word / Excel formats and you only need to insert logo of your company and it is ready for submission and approval.
Click here to download electrical method statements.
Step 1: Electrical Circuit Isolation
Isolate the main electrical connections and supply line from the gen-set.
Cut off the main circuit...
The purpose of this method statement is to specify the detailed requirements and procedure for testing & commissioning of installed CCTV System...
Installation of Control Panel for ACS Access Control System.
Mount the controller to a panel using screws. Connect the Ethernet, Service port and...
The purpose of this method statement is to outline the sequence & method of Testing & Commissioning of Automatic transfer & Bypass...
Electric installation and maintenance work may be carried out only by appropriately qualified licensed electricians. Mains connections must be...
Before starting the batteries installation begins, inspect for signs of damage or missing components. Store the battery in a dry, clean and...
Method Statement For The Testing and Commissioning of Main Sub-Main Distribution Boards (MSMDB) Sub-Main Distribution Boards (SMDB) Distribution...
Upon completion of the LV Distribution Board installation including proper terminations into each breaker, the same shall be offered up for...
General Requirements
Batteries, fuel & auxiliary power must be isolated before carrying out initial inspection.
Ensure that the control...
All cables and termination hardware shall be 100% tested for defects in installation and to verify structured cabling system performance under...
Ticketing dispenser shall be installed in retail parking entry point. Access to the car park will be granted via ticketing dispenser with bar code...
The preformed or saw-cut vehicle induction loop shall be buried in Entry and Exit drive lanes as per the approved shop drawings and the project...
The Vehicle loop cables shall be laid on the drive lane for entry & exit locations, to detect vehicle presence at drive lanes. In addition,...
SCOPE OF WORK: This Method Statement describes the procedure for repairing the damaged outer jacketing of cables using wrap around heat shrinkable...
Download Method Statement For Testing & Commissioning Of Smoke Management System
Download Package Contains the Method Statement +
Checklist...