Central Battery Emergency Lighting System – Electrical Installation Method Statement

This document describes the methodology for the installation of emergency Lighting central battery System in any kind of project. Following this electrical installation method shall ensure that all concerned persons are familiar with the sequence of activities, utilization of resources, and execution

2024
Apr
1

MV Switchgear Installation Method Statement

This method statement for installation of medium and low voltage switchgear and panels boards on site is prepared to define the method used to ensure that all MV/LV switchgear and panels site assembly, installation, final connection and workmanship is correct and acceptable

2024
Jan
26

Generator Installation Method Statement Including Fuel Tank Installation at High Level

standby diesel generator installation instruction

This method statement covers the generator and fuel tank installation for any kind of project. Prior to commencement of the works, all activities shall be coordinated with Project Safety Officer and PTW holder, who will assess the associated risks, and monitor the

2024
Jan
4

Termination of Fiber Optic Cables

Mass (Ribbon) Fusion Splicing

This fiber optic installation method statement covers the termination of fiber optic cables with patch panel, network distribution cabinet NDC and door junction box but can be applicable for any kind of network installations. Roles and Responsibilities: The electrical manager shall be

2023
May
2

Method Statement for Installation of Central Battery System

Method Statement for Installation of Central Battery System CBS

The following procedure will be followed for installation of Central Battery system and can be customized as per the specific needs for different projects. Emergency lighting battery system shall be of modular construction with all modules being plug in type encapsulated design. The