Below is a precise method statement for scaffolding installation for any kind of project. The following method statement is written to provide a safe and efficient system of work for the installation of general working scaffold to all areas of construction sites
Read Complete Method
This roadwork method statement describes work methodology for road construction covering the activities from subgrade to asphalt work. All personnel working at site shall have full knowledge and expertise in the excavation, backfilling, compaction and road testing process. Occupational health and safety
Read Complete Method
All necessary clearing and grubbing and topsoil excavation (where necessary) will be completed prior to the beginning of the excavation. The location will be demarcated to show the limits and depths of the excavation. Disturbing and spoiling material and vegetation outside of
Read Complete Method
Diaphragm & Guide Walls Requirements The design and construction of the diaphragm wall including all its associated works such as guide walls, anchors, etc., shall be the responsibility of the Contractor and shall take into account the actual site, ground conditions, the equipment
Read Complete Method
The work specified herein includes the design, documentation, furnishing, and installation of earth retention systems for excavations. The earth retention system shall be either singular or multiple stages comprised of soldier piles and laggings, sheet pile wall and bracing, raker or timber
Read Complete Method
Below is a precise civil work method of statement that covers the detailed procedure for the scaffolding / formwork, rebar installation and concreting operation applicable for footing, pedestals and pile caps etc. Also to explain how footing, pile caps, trenches, grade beam
Read Complete Method
The purpose of this procedure is to define how the wall panel installation and fabrication at a construction site shall be carried out under the controlled conditions. Scope of work under this method statement covers the detailed procedure to be followed for
Read Complete Method
The piling contractor shall submit to the consultant the piling forms and formats for approval prior to the commencement of piling works. Piling contractor shall maintain and provide all the record for each pile driven. Handling and Storage of Piles The piling
Read Complete Method