The purpose of this procedure is to define how the wall panel installation and fabrication at a construction site shall be carried out under the controlled conditions. Scope of work under this method statement covers the detailed procedure to be followed for
Read Complete Method
The piling contractor shall submit to the consultant the piling forms and formats for approval prior to the commencement of piling works. Piling contractor shall maintain and provide all the record for each pile driven. Handling and Storage of Piles The piling
Read Complete Method
Below road works method statement covers the construction of Dry Lean Cement concrete sub-base for cement concrete pavement in accordance with requirement of roadwork specifications in conformity with the lines, grades and cross sections shown on the drawings and or as directed
Read Complete Method
This macadam work method statement covers laying and compacting clean, crushed, graded aggregate and granular materials premixed with water into a dense mass on a prepared Granular Sub base Course to specified lines, grades and cross sections as shown in drawings, subject
Read Complete Method
This method statement is applicable for collecting samples for concrete before and during concrete pouring activities and doing the standard tests. The aim of this civil works method statement is to provide and maintain effective quality control procedures and to execute the
Read Complete Method
The purpose of this document is to identify the environment, the activities and the associated risks for working over or near water and define the safety, health and environmental requirements with the aim to eliminate risks, or reduce it to as low
Read Complete Method
This construction methodology for the swimming pool and jacuzzi installation consists of descriptive details and the installation sequence for guiding the employees of a pool installation company. Scope of work covers the supply and installation of the Swimming Pool and Jacuzzi. All
Read Complete Method
The purpose of this method statement is to define the procedure for sequence of works for dewatering in construction works at site to complete the excavation from the existing levels down to the formation level considering all safety and quality requirements. This
Read Complete Method