2024
Sep
30

Scaffolding Method Statement

Scaffolding Method Statement

Below is a precise method statement for scaffolding installation for any kind of project. The following method statement is written to provide a safe and efficient system of work for the installation of general working scaffold to all areas of construction sites

2024
Sep
25

Method Statement for Road Construction

Road work Binder Course Spreading with Asphalt Paver Machine

This roadwork method statement describes work methodology for road construction covering the activities from subgrade to asphalt work. All personnel working at site shall have full knowledge and expertise in the excavation, backfilling, compaction and road testing process. Occupational health and safety

2024
Jul
22

Earth Retention Shoring System for Excavations – Part 2 of 2

Diaphragm-Walls-Requirements-and-design

Diaphragm & Guide Walls Requirements The design and construction of the diaphragm wall including all its associated works such as guide walls, anchors, etc., shall be the responsibility of the Contractor and shall take into account the actual site, ground conditions, the equipment

2024
May
20

Method of Statement for Formwork, Rebar Installation and Concreting

Method Statement for Scaffolding, Formwork, Rebar Installation and Concreting

Below is a precise civil work method of statement that covers the detailed procedure for the scaffolding / formwork, rebar installation and concreting operation applicable for footing, pedestals and pile caps etc. Also to explain how footing, pile caps, trenches, grade beam

2024
May
10

Method Statement for Wall Panel Installation

Method Statement for Wall Panel Installation

The purpose of this procedure is to define how the wall panel installation and fabrication at a construction site shall be carried out under the controlled conditions. Scope of work under this method statement covers the detailed procedure to be followed for

2024
Mar
30

Driven Piles Installation Method Statement

Driven Piles Installation Method Statement

The piling contractor shall submit to the consultant the piling forms and formats for approval prior to the commencement of piling works. Piling contractor shall maintain and provide all the record for each pile driven. Handling and Storage of Piles The piling