The purpose of this Method Statement is to illustrate how plastering work is to be carried out with safework implementation. Plastering method statement defines the methodology of all kind of plastering works related to a construction project covering the main contractor works.
Read Complete Method
The purpose of this procedure is to safely recover mobile equipment that may have been bogged, overturned, suffering from mechanical/structural failure, slipped over an edge or into a culvert, or similarly immobilized. It provides instruction for recovery operations that require the use
Read Complete Method
The purpose of this concreting method statement is to define the guidelines for the preparation of the concreting work for pedestrian walkway (broom finish) and to ensure the safe execution of all the concrete works during construction phases of the project so
Read Complete Method
The purpose of this method statement is to cover the steps for repairing of painting works on beam, column, slabs, and walls etc. Overall painting subcontractor is responsible for implementation of this procedure on a project or building. Below is list of
Read Complete Method
Below is a brief method statement that details general procedures to be followed for excavation & backfilling of foundations, Sub-structures & Trenches for any type of the construction and road project. The method covers survey works, excavation, backfilling, compaction and area cleaning
Read Complete Method
Below are standard specifications and quality control requirements for concrete reinforcement including tension, compression, and temperature reinforcing steel, including welded wire fabric, and epoxy coated reinforcing. The scope of work includes furnishing, fabrication, and placement of reinforcement for cast-in-place concrete, including bars, welded wire fabric, ties, and supports. Related
Read Complete Method
The purpose of this procedure is to provide safework instruction for the safe erection, dismantling and structure design of temporary works. Definitions and Abbreviations Temporary Works: Any temporary structure required to construct a permanent structure or used to support a permanent structure.
Read Complete Method
The purpose of this document is to outline the proposed methodology for the construction of the cast-in-situ bored piles using temporary casings. Aim of the procedure is to detail the sequence and method of pile construction, identify the hazard, assess the associated
Read Complete Method