2025
Jun
25

Installation of Glazed Aluminum Curtain Wall & Composite Cladding

Installation method statement for Curtain Wall

You can find a very good method statement on this page for the installation of Glazed Aluminum Curtain Wall, Skylight & Composite Cladding works. Installation will be carried out in accordance with project specifications and approved shop drawings. MEP clearance shall be

2025
Jun
24

Method Statement for Hydrostatic Testing of Metallic Pipework

The purpose of this method statement is to make sure that hydrostatic pressure testing of chilled water piping system is done safely as per client requirements and applicable mechanical standards. Method statement covers the hydrostatic testing of chilled water steel pipework at

2025
Jun
21

Hot Water Calorifier Testing and Commissioning Method Statement

Hot Water Calorifier Testing and Commissioning Method Statement

This method statement is applicable for the testing and commissioning of hot water calorifier or water heater for any kind of building or projects. Arrange below tools before start of the work: Electrical Toolbox Box spanner set Pipe wrench Pre Commissioning Requirements

2025
Jun
20

Underground Coated Carbon Steel Piping Excavation, Installation, Jointing and Backfilling Method Statement

Underground Coated Carbon Steel Piping Excavation, Installation, Jointing and Backfilling Method of Statement

This mechanical method statement covers the excavation, installation, jointing and backfilling of underground coated carbon steel piping. The pressure testing of all steel piping system will be conducted in accordance with applicable Hydrostatic Test Procedure. Roles and Responsibilities Project Manager is responsible

2025
Jun
15

Safety Instructions for the use of Compressed Air Tools and Units

Safety Instructions for the use of Compressed Air Tools and Units

The purpose of this safety procedure is to provide instruction and direction as to what the correct usage of compressed air tools and equipment should be to minimize the risk of injury to personnel and assets. Below procedure is applicable for all

2025
Jun
13

Aluminum Sliding Doors Installation Method of Statement

Method Statement For Installation Of Automatic Aluminium Sliding Door

Below is the procedure for performing the sliding door/ aluminum door installation for any kind of building project. Before start of the sliding doors installation work, make sure the approval of material submittal and subcontractor / supplier. Ensure that shop drawings is

2025
Jun
3

Occupational Health and Safety Procedure for Mobile Elevated Work Platform

Below is a precise procedure that provides instructions for the safe use of Mobile Elevated Work Platforms (EWP), applicable for all kind and size of projects. Overall project director and project HSE team is having responsibilities for the implementation of this occupational

2025
May
20

Method Statement for Testing & Commissioning of Foam System

Below is a precise foam system testing procedure that is applicable for testing and commissioning of foam fire suppression system. This page is not covering all sections of a complete method statement template but only operational sections. Before commissioning the foam system

error: Content is protected !!