Below is a precise method statement for the rcc precast boundary wall construction and installation as per project specifications and approved drawings. Quality requirements shall be complied during all activities as per project quality plan, specifications and approved method statements. List of
Read Complete Method
The purpose of this hydrostatic testing procedure is to list out various steps involved in hydrostatic pressure testing, pigging, draining, swabbing and drying of pipelines for any kind and size of pipeline project in line with the project specifications and applicable standards
Read Complete Method
As part of the Field Quality Control as per specification clauses, testing and commissioning of the ATS Panel will be carried out as per the approved method statement under the direct supervision of factory authorized service representative. Below are standard ATS testing
Read Complete Method
This method provides you guidelines for the safe use of aluminum mobile scaffolds and standard instruction applies to all applications where people are using aluminium mobile scaffold towers. Overall project manager and HSE manager are responsible for the implementation of this standard
Read Complete Method
The purpose of this method statement for reinforcement works is to lay down the systematic procedures for the various activities required for installation of reinforcement bars to ensure that all works are carried out in accordance with the approved shop drawings, bar
Read Complete Method
Below is a precise method statement for electrical wiring installation for any kind and size of project. This work method statement explains and covers the wiring through conduits and its termination to the equipment / boards etc. Required Tools Pulling Rope Lubricant
Read Complete Method
There are many different welding processes, but the most commonly used in the construction industry are gas welding and electric arc welding. In order to ensure that all welding works takes place in a safe manner, the suitability of the following should
Read Complete Method
The purpose of this electrical method statement is to outline the sequence & method of Testing & Commissioning of Automatic transfer & Bypass isolation switch. This procedure is to be read in conjunction with relevant ATS operators manual and User’s guide. By
Read Complete Method