Painting Procedure for Firefighting and Fire Protection Piping Network

This method of statement covers the painting procedure of firefighting and fire protection pipe, fittings and accessories for any kind of construction project. The pipe painting procedure defines the method used to ensure the painting has been carried out as per contract specifications and industry best practices. It gives details of how the work will… Read More »

Method statement for the Installation of Medical Gases System in Hospital Project

This method statement covers the installation of medical gases system horizontal and vertical piping installations through all the areas in the hospital project. The medical gas pipes shall run horizontally in the main routing in the corridors. The vertical running will be through the pipes drops to the medical gases outlets, bed head units and… Read More »

Construction Project Management Review TQM Procedure

Reviewing the performance of any project or organization is key to its success and growth. This is best practice to conduct management review meetings for agenda of continuous improvement. Any organization that implements total quality management or TQM on their processes and projects must establish a management review procedure for regular review of its progress… Read More »

Water Supply Piping Installation Method Statement – HDPE, uPVC, Copper & PPR Pipes

This plumbing method of statement covers the installation of domestic water supply piping and accessories. The procedure defines the method to ensure the installation work is done as per contract requirements, specifications and best practices. It gives details of how to carry out the work and what health and safety issues and controls are necessary.… Read More »

Method Statement for Preparation and Construction Of Cast In Place Concrete Works for Substructures

The purpose of this civil work method statement is to define the procedure for the preparation and construction of Cast in Place Concrete Works for substructures in accordance with the requirements specified in the relevant specifications, procedures and drawings, considering safety and quality of the work activities. Click Here to download Full Civil Method Statement… Read More »

Pile Cutting & Trimming Method Statement

The purpose of this Method Statement is to define the procedure for the cutting of piles to the approved cut off level. General sequence of work may include: Auger fitted with appropriate head Auger drilled into ground to required depth. Steel reinforcement cage lowered in the bore hole, with the upper lap length enclosed in… Read More »

Project Approvals – Statutory and Regulatory Requirements for Construction Projects

This procedure describes the requirements on statutory approvals to ensure all necessary regulatory and statutory project approvals are obtained in a timely manner to support engineering activities, construction activities and project completion etc. The process related to statutory/regulatory project approvals is described below, all parties shall  allocate sufficient cost, time and resources for this activity… Read More »

General Sequence of Works in Preparation of Building Foundation Up To The Level Of Blinding Concrete

The purpose of this article is to define the procedure for sequence of works in preparation for the foundation up to the level of blinding concrete, considering all safety and quality requirements. Preparation of foundation works at site involves water proofing, screed and casting of foundations including column and lift pit footings. Prior to commencement… Read More »