2015
Mar
17

Continuity & Insulation Resistance Testing Report

INSTALLATION & TEST REPORT Project      : Doc Ref No   : Test Instrument (Serial NO.s) SCM Ref No : Tested By     : Continuty tester               : Fed From  : Date             : Insulation Tester              : SCM Ref No Circuit Ref No Phase & Neutral Size

2015
Mar
17

Testing & Commissioning Report For Fire Alarm System

fire alarm system

Fire Alarm system includes Fire detection and alarm system. Manufacturer for the Fire Alarm system is Simplex -USA. Fire Alarm system devices are UL and ULC listed and meets NFPA 70, Article 250, NFPA 72, NFPA 780 & EN 60 8 49 standards.

2014
Mar
7

Construction Project Safety HSE Plan Template Download Link

If you are willing to submit a project hse plan then this page is designed in order to provide you an overview of the components of a project HSE plan. The hse or safety plan is a very important document created at

2013
Sep
7

Sample Checklist for Pre Commissioning Of Chilled Water Pump

The pump operation is controlled as per the chilled water or cooling requirements and sequence of operation is automated via field control devices i.e. valves, thermometers and pressure switches etc. Pump sets are supplied mounted on a substantial fabricated base plate; the

error: Content is protected !!