2021
Feb
7

Bulldozer Grader and Excavator Maintenance and Track Replacement Standard Procedure

Bulldozer and Excavator Track Replacement Standard Procedure

Below is the standard procedure that is helpful for project maintenance team for maintenance and track replacement for bulldozers and excavators. This instruction shall apply to all track replacement operations and other preventive maintenance actions for bulldozers, graders and excavators under the

2021
Jan
16

Confined Space Definition Entry & Working Procedure

confined space entry hazards and training requirements

The purpose of this safework method is to assist the organization in the identification and establishment of  standard procedure for the safe entry and work in confined space. This document addresses safety instructions for both projects and offices of the company. Additional

2020
Nov
2

Occupational Health and Safety Recognition Award Scheme

Occupational Health and Safety Recognition Award Scheme

This document describes the guidelines on the HSE recognition and awards scheme for a company or organization. Through the health and safety award scheme occupational safety and health administration recognizes efforts made by the employees, partners and sub-contractors in achieving high standards

2020
Oct
3

Construction Project Management Review TQM Procedure

Reviewing the performance of any project or organization is key to its success and growth. This is best practice to conduct management review meetings for agenda of continuous improvement. Any organization that implements total quality management or TQM on their processes and

2020
Jun
5

General Sequence of Works in Preparation of Building Foundation Up To The Level Of Blinding Concrete

The purpose of this article is to define the procedure for sequence of works in preparation for the foundation up to the level of blinding concrete, considering all safety and quality requirements. Preparation of foundation works at site involves water proofing, screed

2020
Apr
10

Control of Engineering Documents Procedure for Quality Management System

Control of Engineering Documents Procedure

This procedure describes the requirements on the control of engineering documents. This is an essential document control procedure that ensures all engineering drawings and related technical documents essential for completing the works, including shop drawings by vendors, manufacturers and subcontractors on Projects

2020
Apr
1

Lock Out Tag Out LOTO Construction Safety Isolation Procedure

This lock out tag out procedure shall help companies to establish a standard for the safe isolation of machinery, equipment and any other energy source which may need isolation by means of a lock-out tag-out LOTO system. Overall the project head /

2019
Nov
28

Method Statement for an EPC Construction Project

Construction Project Management and Methodology

This method statement for construction project consists of the following sections. 1. General Execution Strategy 2. Details of Design and Engineering Plan 3. Material Management Planning and List of Long Delivery Material 4. Construction and Installation Activity 5. Safety and Environmental Plan