Below is the standard procedure that is helpful for project maintenance team for maintenance and track replacement for bulldozers and excavators. This instruction shall apply to all track replacement operations and other preventive maintenance actions for bulldozers, graders and excavators under the
Read Complete Method
The purpose of this safework method is to assist the organization in the identification and establishment of standard procedure for the safe entry and work in confined space. This document addresses safety instructions for both projects and offices of the company. Additional
Read Complete Method
This document describes the guidelines on the HSE recognition and awards scheme for a company or organization. Through the health and safety award scheme occupational safety and health administration recognizes efforts made by the employees, partners and sub-contractors in achieving high standards
Read Complete Method
Reviewing the performance of any project or organization is key to its success and growth. This is best practice to conduct management review meetings for agenda of continuous improvement. Any organization that implements total quality management or TQM on their processes and
Read Complete Method
The purpose of this article is to define the procedure for sequence of works in preparation for the foundation up to the level of blinding concrete, considering all safety and quality requirements. Preparation of foundation works at site involves water proofing, screed
Read Complete Method
This procedure describes the requirements on the control of engineering documents. This is an essential document control procedure that ensures all engineering drawings and related technical documents essential for completing the works, including shop drawings by vendors, manufacturers and subcontractors on Projects
Read Complete Method
This lock out tag out procedure shall help companies to establish a standard for the safe isolation of machinery, equipment and any other energy source which may need isolation by means of a lock-out tag-out LOTO system. Overall the project head /
Read Complete Method
This method statement for construction project consists of the following sections. 1. General Execution Strategy 2. Details of Design and Engineering Plan 3. Material Management Planning and List of Long Delivery Material 4. Construction and Installation Activity 5. Safety and Environmental Plan
Read Complete Method