Category Archives: Construction Method Statements

Construction method statements are basic documents that a site engineer needs when he starts the construction works.
Our website provides hundreds of construction method statements related to civil, electrical, mechanical, plumbing, HVAC and firefighting disciplines.
We recommend you to visit our construction method statement online portal where you can search different documents as per your needs.

Underground Piping Fabrication and Laying Method Statement

Purpose of this mechanical work procedure is to provide guide lines to carry out underground piping fabrication and laying and to ensure that proper quality control and documentation are maintained at project site. The scope of this procedure covers fabrication, installation and relevant inspection for all underground piping works including relevant civil works at the… Read More »

Building Management System BMS Installation Testing and Commissioning Method Statement

Below is a precise and best method of statement that is applicable for installation, testing & commissioning of BMS building management system in accordance with the specified standards and regulations in project specifications. The scope of works includes the delivery to site, installation, testing & commissioning of the BMS system as described in the project… Read More »

Roof Cladding | Wall Cladding Method Statement

Below is a precise method statement for installation of insulated roof cladding and wall cladding installation. List of necessary plant, machinery, materials and tools: Lifting Equipment 50 ton mobile crane (2 No.) 25 ton mobile crane (4 No.) 3 ton telescopic boom loader Scaffoldings Man lift Electrical equipment Generator Drill (110 volts) Screw gun Electrical… Read More »

Civil Method Statement for Pond Work

This civil Method Statement defines the procedure to carry out the pond work as per requirements in project specifications to ensure the safety and quality of the work. Method statement covers excavation activity, rebar installation, formworks, concrete pouring, curing of concrete, formwork dismantling, finishing, and other civil work base on civil work item list. Subcontractor… Read More »

Access Control System Installation

This access control system installation method statement provides steps for the installation of access control security system in order for operatives to understand the work to be executed, how it is to be executed while making references to other technical standards and relevant national/international standards. Method statement covers installation of ACS access control system including brackets,… Read More »

Method statement for Aluminium Windows and Doors Installation Including Glazing

Below is a precise method statement for the installation of aluminium windows and doors including the glazing works. The method of statement describes the sequence of events from the receipt of the order through the completion of the Aluminium windows and doors related glazing work. All work will be carried out in accordance with project… Read More »

Ceiling Spray Plaster Works Method Statement

Below is precise civil work method statement that details general procedure to be followed for ceiling spray plaster works at any kind and size of project. The procedure includes preparatory works & method of ceiling spray application. Arrange below tools and equipment before starting the ceiling spray paint and spray plaster activities: Wire brush Skimmer… Read More »

Water Chiller Installation Method Statement

Below is a standard method statement or procedure which can be used for installation of water chiller on its foundation after it is delivered on the sites. Before starting the activity of chiller installation following tools/equipment shall be arranged: Tool Box Lifting Equipment (Cranes) Electric Drill Machine Ladders Threading Machine Welding/ Brazing Machine (if required)… Read More »