Plumbing Method Statements

strainer installation method statement

Method Statement for Installation and Maintenance of Strainer

Strainers are installed to prevent foreign matter e.g. scale and dirt causing damage to pipeline equipment. Service temperature and pressure indicated on the identification plate or body marking should not be exceeded. Crane strainers have not been designed as fire safe pressure equipment. Strainers must be installed into a well-designed system and it is recommended […]

Method Statement for Installation and Maintenance of Strainer Read More »

Plumbing Method Statements
irrigation-system-piping

Method Statement Irrigation Systems Piping

Only approved material shall be used. Delivered material shall be stored at stores and shall always be subject to client’s representative inspection. Special shaded pipe racks shall be constructed to store pipes. Fittings and irrigation materials shall be stored inside containers that will be kept closed at all times. Transportation: All materials will be transported to

Method Statement Irrigation Systems Piping Read More »

Plumbing Method Statements

Drainage Pipe Installation & Hydrostatic Testing Method of Statement

When off loading, the drainage pipe shall be lowered to the ground either manually or with crane. Timber supports of at least 3” wide shall be placed beneath the pipes with spacing not greater than 2 mtrs. Closer supports will be required for sizes below 160mm. Drainage pipes shall not be stored under direct sunlight

Drainage Pipe Installation & Hydrostatic Testing Method of Statement Read More »

Construction Method Statements, Method Statements, Piping Method Statements, Plumbing Method Statements

UV Sterilization System Testing and Commissioning Method Statement

Ultraviolet UV Sterilization System are useful in many water purification systems to disinfect and control bacteria. Ultraviolet or UV energy is found in the electromagnetic spectrum between visible light and x-rays and can best be described as invisible radiation. UV light occurs with a wavelength ranging from 200 to 390 nanometers (nm). The most effective

UV Sterilization System Testing and Commissioning Method Statement Read More »

Method Statements, Plumbing Method Statements, Testing & Commissioning
domestic water treatment

Cartridge Filters UV Sterilization Unit and Chlorine Dosing System Installation

Before starting the site installation work domestic water treatment system, ensure all civil works are completed for the area of installation, and civil clearance is obtained from respective authorities to proceed further. Prior to start the installation, refer to the approved shop drawings and BOQ related to the area of installation and ensure that required

Cartridge Filters UV Sterilization Unit and Chlorine Dosing System Installation Read More »

Method Statements, Plumbing Method Statements

Method Statement for Water Tank Installation – GRP Water Tank

Below is a precise and comprehensive method statement for water tank installation (GRP Water Tank). The water tank installation shall be carried out by specialist contractor based on the following steps and shall be done in accordance with the approved shop drawings, specifications and approved material submittal. Installation contractor shall properly coordinate with the civil

Method Statement for Water Tank Installation – GRP Water Tank Read More »

Method Statements, Plumbing Method Statements