The purpose of this document is to outline the proposed methodology for the construction of the cast-in-situ bored piles using temporary casings. Aim of the procedure is to detail the sequence and method of pile construction, identify the hazard, assess the associated
Read Complete Method
This civil method statement is prepared to state the proposed construction method for prestressing works and shall be, upon approval by the consulting engineer, distributed to all parties concerned so that the prestressing works can be carried out with the same information.
Read Complete Method
Below is a brief method statement for Fuel Oil System, that covers the backfilling and cathodic protection of underground pressure vessel / fuel storage tank. Overall project manager is responsible for the implementation of project quality and safety requirements and achieving the
Read Complete Method
Below is a brief method statement that covers installation of water feature equipment’s and accessories, in accordance with project specifications and manufacturer’s installations. MEP project manager, engineers site supervisors shall have overall responsibility for adherence to the approved method statement, project quality
Read Complete Method
This method of statement covers the nature and type of work for structured cabling installation as per approved material submittal and site requirements for the construction project. Method statement also covers frequency of which the inspections are to be carried out. Any
Read Complete Method
Pre-construction meeting will take place to brief all requirements on the implementation of this firefighting method statement. All operatives will attend the Project Safety induction prior to commencing work on site. As a minimum requirement, daily toolbox talk will explain and discuss:
Read Complete Method
Below method covers the erection of the tank by joining the top and bottom portion through the welding procedure. Prior to the commencement of the works the lifting supervisor must ensure that all site personnel are adequately briefed on the contents of
Read Complete Method
Setting Out the Layout Refer to the final layout drawing prepared with reference to the actual demarcation, set back adjustments, final levels and other development works. Check if the site is cleaned and leveled properly by cutting or filling. Start the layout
Read Complete Method