Tag Archives: Construction Site

Bored Pile (Cast-in-Situ) Construction Method Statement

The purpose of this document is to outline the proposed methodology for the construction of the cast-in-situ bored piles using temporary casings. Aim of the procedure is to detail the sequence and method of pile construction, identify the hazard, assess the associated risks involved, develop and implement adequate control measures and to provide a safe… Read More »

Temporary Electrical Supply HSE Procedure For Construction Site

Below procedure will help you to establish a safe standard for the installation of temporary and permanent electrical fixtures/appliances on project sites. Overhead Cables: Overhead supply from the supply point or metering point to the distribution boards on the site should be of a robust pattern and preferably pliable and wire armoured with a further outer… Read More »