2022
Feb
20

Underground Coated Carbon Steel Piping Excavation, Installation, Jointing and Backfilling Method Statement

Underground Coated Carbon Steel Piping Excavation, Installation, Jointing and Backfilling Method of Statement

This mechanical method statement covers the excavation, installation, jointing and backfilling of underground coated carbon steel piping. The pressure testing of all steel piping system will be conducted in accordance with applicable Hydrostatic Test Procedure. Roles and Responsibilities Project Manager is responsible

2022
Jan
31

Method Statement for Installation of Thermal Insulation on Pipes

Method of thermal insulation and Lagging for Pipe Elbow

Below is a detailed method statement for thermal insulation application on pipes, fittings and equipment connections. Calcium silicate insulation is used for thermal insulation of indoor piping and fittings. Perlite insulation is often used where water entering an insulation system may cause

2022
Jan
27

Method of Statement for Protection Screed of Waterproofing Membrane

Method of Statement for Protection Screed of Waterproofing Membrane

This civil work method statement describes the brief procedure and responsibilities of site personnel who are involved in the work for protection screed of waterproofing membrane. Project manager is overall responsible for the implementation of this method during the project civil works

2022
Jan
11

Inspection and Test Requirements for In-Situ Concrete Placement

Inspection and Test Requirements for In-Situ Concrete Placement

This procedure covers checks and quality control requirements for carrying out in-situ concrete operations. Daily concrete requirements shall be provided to the RMC supplier including quantity, mix  details, workability time, delivery rate and access arrangements. Site Engineer shall ensure that checks on

2022
Jan
5

Steel Bar Rebar Reinforcement Cutting Bending and Fixing Procedure

Steel Bar Rebar Reinforcement Cutting and Bending Procedure

The scope of this procedure covers the control required for cutting, bending and fixing of steel reinforcement bars, including scheduling and dimensioning. All fixing, cutting and bending of reinforcement bars will be carried out in accordance with the specification detailed in the

2021
Dec
19

Explosive Power Tools Operation Safety Instructions

Explosive Power Tools Operation Safety Instructions

The purpose of this safety procedure is to provide the safety requirements for the use of power actuated fastening tools. This Instruction applies to all applications where power actuated tools are used on a project. Always refer to the power tool operating

2021
Nov
22

Drainage Accessories Installation Method of Statement

Below is a precise method of statement that describes the procedure for installation of Drainage Accessories. This document defines the methods to be used to ensure that the plumbing works to be conducted at site are in compliance with the approved designs

2021
Oct
10

Excavation Work Guidelines for Irrigation and Water Supply Projects

Excavation Work Guidelines for Irrigation and Water Supply Projects

This excavation method statement serves as a guideline for the excavation works undertaken during the construction project. The process will include methods to carry out the excavation and surface preparation, in compliance with the applicable environmental and safety measures. Construction manager is