Tag Archives: post tensioned slab

Precast Post Tensioned Beam Installation Procedure

This civil method statement is prepared to state the proposed construction method for prestressing works and shall be, upon approval by the consulting engineer, distributed to all parties concerned so that the prestressing works can be carried out with the same information. The prestressing systems is STRONG FORCE (M) Multi Strand Bonded System using 15.24mm… Read More »