2013
Apr
17

Method Of Statement For Installation of GI Conduits & Accessories For Electrical Works

Method Of Statement For Installation of GI Conduits & Accessories For Electrical Works is given below for the reference of our visitors if you want to use this method statement for your own work or company you can follow the complete method

2013
Apr
2

Method Statement for GI & PVC Conduit Installation Including Accessories

Below is a comprehensive method statement for GI and PVC conduit installation which can be used for purpose of any project and it can be approved easily by consultants because it covers all aspects of a standard conduit installation method. We have also given

2013
Mar
31

Installation & Leakage Testing Method Statement of Drainage Piping

This page provides a precise method statement for drainage pipe installation which is useful for any kind of project. Below is list of plant & equipment used for the drainage piping installation work: Measuring tape Tool Box Measuring Tape Hack Saw Spirit

2013
Jan
3

Procedure for Cleaning and Flushing of the Chilled Water Piping System

cleaning and flushing of chilled water piping

Cleaning and flushing of chilled water piping system is very important part of any HVAC project. During installation there are many sources from which debris, dusts and even metallic parts enter the system. Before putting the system in operation cleaning and flushing

2012
Nov
29

BMS Testing & Commissioning Method Statement For Building Management System

Below method statement is for testing and commissioning of DDC panels and FCU (fan coil units) with respect to building management system BMS. Pre-Commissioning Checks for field Instruments Check installation of all field instruments for correct location and position as instructed in

2012
Nov
12

Construction Method Statement For Installation of Chilled Water Piping System

This method statement covers on site installation of pre-fabricated and site fabricated mild steel pipework including supports, expansion and anchor points for chilled water system. This procedure is to define the method used to ensure that the Chilled Water Pipework System installation

2012
Nov
10

Method Statement For Cable Pulling and Final Electrical Connections To MV & LV Equipment

cable connections and termination method statement

1. Purpose This Method statement covers the installation and final electrical connections to the MV and LV equipment at any electrical project site. All the electrical installation work will be in accordance with the project electrical specifications. 2. Scope of Work This procedure

2012
Nov
6

Method Statement For HVAC Ductwork Insulation and Acoustic Lining

Method Statement For HVAC Ductwork Insulation and Acoustic Lining

1. PURPOSE This method statement covers on site installation of insulation for pre-fabricated duct-work systems manufactured from hot dipped galvanized steel sheet in line with the SMACNA requirements. 2. SCOPE OF WORK This method statement is to define the best method to