2013
Jul
29

METHOD STATEMENT FOR TESTING & COMMISSIONING OF PRESSURIZATION UNIT

The purpose of this procedure is to define the step by step method to implement the correct practices for the pre-commissioning & commissioning of Pressurization Unit through the guidelines contained herein so as to ensure that the job execution complies with the

2013
Jun
9

Method Statement for Installation Of Air Handling Unit AHU & FAHU

Installation of Air Handling Units AHU & FAHU

Below is the brief method of statement for the installation and testing of air handling units i.e. AHU & FAHU. On this page you can see three major sections which are: necessary tools, installation and testing procedure Other parts should be included

2013
May
15

Method Statement for Installation of Electric Water Heater

water-heater-installation-method-statement

The procedures for the installation and fixing of electric water heater with supports and accessories shall be done as per the manufacturer’s recommended guidelines and installation instructions and as per the approved water supply drawings/layouts and detailed drawing as follows. This method

2013
May
13

Method Statement for Switchgear Installation of MV LV HV Switchgear Panels

Method Statement For Switchgear Installation Of MV LV HV Switchgear Panels

1.0 PURPOSE The purpose of generating this method statement is to define the procedure step by step to implement the correct practices for medium voltage switchgear panel installation & its accessories through the guidelines contained herein so as to ensure that the

2013
Apr
28

Method Statement for Installation & Testing of Chilled Water Pipes & Accessories

This chilled water piping installation method of statement is prepared in order to outline the activities and the methods used for the installation of chilled water pipes and accessories. Carry out all project site installation activities in accordance with the contract details

2013
Apr
27

Installation Method Statement Of HDPE Piping

hdpe pipe installation method statement pdf

Below is a classic method statement for the installation of HDPE piping network or domestic water supply system. Any plumbing engineer can get benefit from below method of statement for submission to consultant for a construction project. Material received at site shall

2013
Apr
23

Method Statement For Installation & Testing Of Lightning Protection Earthing & Bonding System

Below is a precise electrical method of statement for installation & testing of Lightning Protection Earthing & Bonding System. The method is very useful for site engineers and electricians to conduct site activities without fail. Arrange following tools before starting the work

error: Content is protected !!