Download Method Statement For Installation of Laboratory Plume Fans & Energy Recovery Coil Integrated System

 This method statement covers the receiving, handling, storage, installation, inspection, identification, and pre-commissioning verification of laboratory plume fans used in laboratory exhaust systems.

The scope includes all mechanical, structural, electrical, control, vibration isolation, and ductwork interface activities associated with induced-flow and high-plume dilution exhaust fan systems.

Download Package Contains the Method Statement +

Checklists for Installation +

Inspection & Testing Plan +

Risk Assessment

You only need to change project name and

insert logos etc and the same shall be

ready to be submitted for approval from consultant/clients.

Below is the list of files that are included in download package.

Method Statement For Installation Of Laboratory Plume Fans