Category Archives: HVAC Method Statements

Method statement for building construction is very important for successful completion of the construction projects. HVAC is a major discipline of any project and MEP engineers are using method statements for air conditioning works. Method statements include the ducting works, sleeves, chilled water piping, pipe welding, flushing of pipes and installation of HVAC equipment’s. In addition to installation method statements the requirements is also for testing and commissioning method statements. As part of method statement there are always, risk assessments, inspection and test plans ITP and inspection checklists.

Below you can browse our collection of method statement for HVAC building construction works free of cost. If you are looking for editable files in Word format that you can also use for submission then you may need to visit our method statement download center.
HVAC Building Construction Method Statements

Sequence of Operation for Variable Volume Type FAHU with Plate Heat Recovery

Below sequence of operation is for Variable Volume Type FAHU with Plate Heat Recovery system. The system shall be variable volume package Fresh Air Handling Unit. The scope of the unit shall consist of: Supply Side accessories Intake motorized damper Panel (Pleated) Filter Bag Filter Cooling Coil Supply Fan (with VFD) Plate Heat Exchanger Intake and discharge… Read More »

Method Statement for Installation of GI Ducts for HVAC System

This mechanical hvac method statement covers the installation of GI ductwork. Procedure defines the method used to ensure GI ducting installation has been carried out as per contract requirements and best practices. The method statement gives details of how the work will be carried out and what health and safety issues and controls are involved.… Read More »

How to install Air Handling Unit?

Below is the procedure for the installation of air handling unit which is part of HVAC system. Below precise procedure will help you understand the sequence of installation. Check the AHU’s foundation and ensure it is as per approved drawings. Check the area around the foundation and ensure access to the Air Handling Unit from all… Read More »

Bypass Terminal Reheat Units Testing & Commissioning Method

Pre-Commissioning Procedure Before starting the commissioning activities check and ensure that bypass Terminal Reheat units are installed as per the approved shop drawings and manufacturer’s instructions and approved. Check that sensing grids tubing connection from the grids to the transducers are correct & secure. Check for proper mounting of the actuator on the body of… Read More »

Condensate Water Filter Installation Method Statement

The Condensate Water Filter (Side Stream/ Multimedia) are compact filtration packages for the removal of grit, airborne particles and scale from cooling tower water in order to avoid system fouling. A licensed and/or trained/experienced plant electrician and millwright-pipe fitter should install this packaged system. Ensure that the concrete pad is level and structurally sound to… Read More »

Installation Method Statement for Crane Gem Rubber Lined Butterfly Valves

These instructions relate only to Crane Gem rubber lined Butterfly valves, which are designed and manufactured to provide isolation, or can be used for regulation, of flow of suitable fluids. Valves must be installed into a well-designed system and it is recommended that the system be inspected in accordance with the appropriate member state legislation.… Read More »

General Instructions and Method Statement for Chemical Cleaning of Carbon Steel Pipelines

Following is a precise chemical cleaning procedure that will ensure the internal and external cleanliness and protection of the pipes before the piping process unit is put into service. Scope of work covers all the horizontal and vertical pipelines through all the areas in the project and buried underground lines in the infrastructure area as… Read More »

Types of Welding WPS, CWB Arc Welding Tig Welding

Before going to the welding procedure in full detail let’s first understand what is welding? The term welding is used in mechanical engineering when we are joining two or more pieces of any material typically metal by application of heat, pressure or combination of both. This is simplest definition for welding. Mostly the term is… Read More »