Category Archives: Electrical Method Statements

Electrical method statement is used for safe implementation and construction of electrical works.

Before performing any electrical engineering activity one must prepare a method statement for electrical work that will describe scope of work, references, responsibilities, required materials and resources.

The main section of an electrical method statement for construction shall contain steps for installation and construction of the electrical works and components.

We are providing editable method statement swms packages, you can check a sample of  free electrical method statement and after that decide about downloading the full package.

In addition to method statement you shall find inspection and testing plan, inspection/testing checklists and risk assessments for doing the work as part of method statement for electrical works.

Below you can find complete set of electrical method statements and also you can search from the top left section of this page.

In addition you can also find complete set of editable electrical method statement in the form of editable files which are in Word / Excel formats and you only need to insert logo of your company and it is ready for submission and approval.

Click here to download electrical method statements.

How To Make Crimping Joints for Cables & Wires? [Answered]

This document describes the procedure of jointing of wires in the project, and to ensure that all concerned persons are familiar with the sequence of activities, utilization of resources, and execution of the works in compliance with applicable Safety and Quality Procedures, and Project Documents and Specification. Following equipment and tools shall be arranged: Tool… Read More »

Download Method Statement For MV LV Switchgear Panel Testing & Commissioning

Download Method Statement For MV LV Switchgear Testing & Commissioning Now you can Download Method Statement, ITP, Pre Commissioning, Testing & Commissioning Checklists and Risk Assessment For LV MV Switchgear Panels. You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from clients. Below… Read More »

TESTING & COMMISSIONING OF FIRE ALARM SYSTEM

Download Method Statement For TESTING & COMMISSIONING OF FIRE ALARM SYSTEM Now you can Download Method Statement For Fire Alarm System Testing & Commissioning including Pre-Commissioning and Commissioning Checklists The files are in word format and You only need to change project name and insert logos etc and the same shall be ready to be… Read More »

Download Method Statement For PVC & GI Conduits & Accessories Installation

Download Method Statement For INSTALLATION OF PVC & GI CONDUITS & ACCESSORIES Now you can Download Method Statement, ITP, Checklist and Risk Assessment For PVC & GI Conduits & Accessories Installation The files are in Word/Excel format and You only need to change project name and insert logos etc and the same shall be ready… Read More »

Electrical Method Of Statement For Installation & Termination of Cables and Wires

This method statement for electrical work shall help you understand the requirements before and during the cable s and wires pulling process. The document is very helpful for MEP QA/QC engineers to develop the professional electrical method statement for their project. Below is the list of equipment / Tools required for installation of cables and… Read More »

SMATV Installation Method Statement Including Testing

Below are the steps or method statement for SMATV installation & testing for complete SMATV system in a building or project. PURPOSE: The purpose of this method statement is to identify the requirements for installation & testing of SMATV system as per the contract specification, drawings and as per the applicable regulations if any. SCOPE: This… Read More »

Transformer testing & commissioning method statement

Below is a standard method statement which can be used as learning purpose and to prepare further professional method statement for testing and commissioning of transformers. Required tools for transformer testing & commissioning. Portable Hand Tools / Tool Box. Digital Multimeter Earth Resistance Tester Megger Tester. Safety requirements tools such as safety shoes, safety helmet,… Read More »

UPS Installation Testing and Commissioning Method Statement

The purpose of this method statement is to define the procedure for Installation, Testing  and Commissioning of UPS. Also to ensure that agreed  procedures are implemented during execution of the previously described or associated work. Scope of this method statement covers material handling, installation procedure and necessary occupational health and safety precautions. This document applies… Read More »