Method Statement for Civil Works

Method statement for civil works is very important for the building construction works.

These documents are used for approval of the civil construction works.

In order to start a construction activity method statement for building construction should be prepared and submitted for approval.

Click here to download complete set of civil work method statements.

Below is the list of method statements for civil works that you can check by scrolling down and then visiting other pages as well.

You can search a specific civil method statement from search box on right side of this page.

Demolition-Method-Statement

Method Statement & Risk Assessment for Demolishing and Removal of Fence and Shelters

The purpose of this method statement is to illustrate how the existing fence and shelters will be removed from site in proper and safe way. The scope of this method of statement is to cover the demolishing methodology of the following: Chain link fence (internal & external) Shelters Toilet Tents Water station Lighting pole Road […]

Method Statement & Risk Assessment for Demolishing and Removal of Fence and Shelters Read More »

Civil Engineering Methods, Method Statement for Civil Works, Method Statements, Risk Assessment
Total Station Surveying

Case Study – Total Station Surveying and Topography

A project site was used as a case study mainly to highlight the importance of anticipating the presence of hard materials on site and the associated problems if hard materials are detected during construction work. The study was undertaken alongside the remained hilly terrain. The original hills have been leveled down to the required reduced

Case Study – Total Station Surveying and Topography Read More »

Civil Engineering Methods, Method Statement for Civil Works

Road Markings & Markers Method Statement

Below is a brief method statement for road markings and road signs. The method will ensure the quality of work in accordance with the contract requirements and applicable local standards. Following this road work method statement will also ensure that all quality assurance/ control activities are happening in a systematic manner. Arrange following materials and

Road Markings & Markers Method Statement Read More »

Civil Engineering Methods, Method Statement for Civil Works, Method Statements, Roadworks
application heads for weld seam coating

Method Statement for Bituseal Enamel application

The Bituseal Enamel is based on a specially selected bitumen, modified with high performance engineering polymers. This polymer modification ensures improvements of a number of the product’s qualities, e.g. flexibility, adhesion and durability. Bituseal Enamel is supplied in different types/grades, depending on the varying requirements for corrosion protection materials for pipelines. The key factor in

Method Statement for Bituseal Enamel application Read More »

Civil Engineering Methods, Method Statement for Civil Works
bulk earth work method statement

Method Statement for Bulk Earthworks

This Method Statement describes the works operation to undertake mass earthworks and sub grade construction that comply with the specified requirements for construction of new or widening of existing road under normal circumstances. The works covers all work in connection with the construction of cuts and fills including, Clearing and Grubbing, the removal to spoil

Method Statement for Bulk Earthworks Read More »

Civil Engineering Methods, Method Statement for Civil Works, Roadworks

Method Statement for Site Clearance Grubbing and Topsoil Removal

The purpose of this procedure is to outline the Site clearance, Grubbing and Topsoil removal. The detailed guide will provide the clear steps undertaken to complete the process of the site clearance activities in a safe, systematic and efficient manner in compliance to the statutory and environmental requirements. The procedure will include the removal and disposal of

Method Statement for Site Clearance Grubbing and Topsoil Removal Read More »