2015
Aug
26

Download Method Statement For Form work

Download Method Statement For FORMWORK INSTALLATION Now you can Download Method Statement For FORMWORK Installation with ITP & Checklist from below link. The files are in Word & Excel formats and You only need to change project name and insert logos etc and

2015
May
24

Download Method Statement for Masonry Block Work

Download Method Statement for  Masonry Block Work Download package contains the Method Statement + Checklist for Blockwork Installation + Inspection & Testing Plan    You only need to change project name and insert logos etc and the same shall be ready to be submitted for

2015
May
17

Method Statement For Installation of Galvanized Wire Mesh/Screen

Method Statement For Installation of Galvanized Wire Mesh/Screen

1. Purpose: The purpose of this procedure is to define how wire screen /mesh installation works shall be carried out under controlled condition. 2. Scope: This Method Statement describes the steps that will be followed for the installation of galvanized mesh /

2015
Feb
17

Termite Control Perfect Method Statement for Anti Termite Treatment

termite control and anti termite treatment procedure

Termite control method statement covers the detailed procedure to be followed for anti termite application under footings, grade slabs, crawl places, around structures, at expansion joints, control joints and the areas where slabs will be penetrated. This procedure shall be read in conjunction

2015
Feb
16

Installation Method Statement For Pre Cast Water Tank

Roles and Responsibilities: Project Manager   will oversee the whole project ensuring that people have the necessary   information to perform their Job Roles. Construction Manager will ensure that the relevant department is aware of and understands the requirements of this Method Statement.  He

2015
Jan
3

Method Statement for Screeding / Topping Above & Below Tiling In Toilet Roof or Raft Slab

Method Statement For Screeding Topping Above & Below Tiling In Toilet Roof or Raft Slab

This method statement covers the detailed procedure to be followed for screeds/topping operation above water proofing in toilet, roof slab and raft slab. Method statement also covers the screeding operation below tiling works in concrete slabs wherever necessary. This floor screeding procedure

2014
Dec
15

Download Method Statement For Plastering Works

Download Method Statement For Plastering Works Now you can Download Method Statement, ITP, Checklist and Risk Assessment For Plastering work. You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from

2014
Nov
28

Method Statement for Water Proofing Self Adhesive Membrane

self-adhesive-water-proofing-membrane

Below is a precise method statement for water proofing works using self adhesive membrane materials from any brand. Following equipment and tools shall be required before starting the water proofing work. Slow speed drill machine Gas Cylinders Hand Tools & PPE Trowel

error: Content is protected !!