Civil Works Method Statements

Method statement for civil works is very important for the building construction works.

These documents are used for approval of the civil construction works.

In order to start a construction activity method statement for building construction should be prepared and submitted for approval.

Click here to download complete set of civil work method statements.

Below is the list of method statements for civil works that you can check by scrolling down and then visiting other pages as well.

You can search a specific civil method statement from search box on right side of this page.

Method Statement for Earthwork Related to Track Work

Before start of work, following equipment and machinery shall be arranged for earthwork and monitoring. Excavators Dump Trucks Bull Dozers Compactor Rollers Settlement Gauges/Settlement Markers Survey Equipment To begin with, licensed surveyor is required to establish the boundary and the temporary bench mark and existing ground level (EGL) all these have to be confirmed by […]

Method Statement for Earthwork Related to Track Work Read More »

Civil Works Method Statements
Installation Of Reinforcement Steel Bars For Footing, Strap Beam, Raft, Slab & All Structural Concrete - Steel Fixing

Standard Requirements for Furnishing, Fabrication, and Placement of Reinforcement Including bars, welded wire fabric, Ties & Supports

Below are standard specifications and quality control requirements for concrete reinforcement including tension, compression, and temperature reinforcing steel, including welded wire fabric, and epoxy coated reinforcing. The scope of work includes furnishing, fabrication, and placement of reinforcement for cast-in-place concrete, including bars, welded wire fabric, ties, and supports. Related standards and codes: ASTM A416/A416M: Standard Specification for Steel Strand, Uncoated Seven-Wire for

Standard Requirements for Furnishing, Fabrication, and Placement of Reinforcement Including bars, welded wire fabric, Ties & Supports Read More »

Civil Works Method Statements, Technical Articles

Download Method Statement For Installation of Wire Screen

Download Method Statement For Installation Of Wire Screen  Download Package Contains the Method Statement + Checklists for Installation + Inspection & Testing Plan + Risk Assessment You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients. Below is the list of files that

Download Method Statement For Installation of Wire Screen Read More »

Civil Works Method Statements
Standard Procedure for Management of Construction Equipment Project Plant Assets

Standard Procedure for Management of Construction Equipment Project Plant Assets

This procedure describes standard procedure for Management of Construction Project Plant Assets. Project plant coordinator is overall responsible for the implementation of this procedure on the construction project. The asset management procedures describes the minimum requirements. Organization will only purchase assets when suitable hire/rental equipment is not available in the market place, and where an

Standard Procedure for Management of Construction Equipment Project Plant Assets Read More »

Civil Works Method Statements
Inspection and Test Requirements for In-Situ Concrete Placement

Method Statement for Formwork, Reinforcement and Concrete Works

Below is a precise method statement for formwork, reinforcement and concrete works, that describes the practices and methods to be used with regards to placing, curing and defect rectification of concrete works & blinding concrete. Prior to the placing of any concrete or concrete pouring all quality checks are to be completed and the “approval

Method Statement for Formwork, Reinforcement and Concrete Works Read More »

Civil Works Method Statements
Mast Climber Installation Method statement

Method Statement for Assembling Erection Installation & Management of Mast Climber

The Scope of this method statement covers all operations and associated activities involved in safe and efficient management of Mast Climber including assembling, erection, and installation for efficient and effective utilization in execution of project works. Following equipment shall be arranged: Tower crane Flat bed Lorries Safety harnesses, Helmet Chain blocks, power tools as required

Method Statement for Assembling Erection Installation & Management of Mast Climber Read More »

Civil Works Method Statements, Occupational Health and Safety

Download Method Statement for Coring & Cutting of RCC Walls

Download Method Statement for Coring & Cutting Of RCC Walls  Download Package Contains the Method Statement + Checklists for Cutting + Inspection & Testing Plan + Risk Assessment You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients. Below is the list of

Download Method Statement for Coring & Cutting of RCC Walls Read More »

Civil Works Method Statements