Civil Works Method Statements

Method statement for civil works is very important for the building construction works.

These documents are used for approval of the civil construction works.

In order to start a construction activity method statement for building construction should be prepared and submitted for approval.

Click here to download complete set of civil work method statements.

Below is the list of method statements for civil works that you can check by scrolling down and then visiting other pages as well.

You can search a specific civil method statement from search box on right side of this page.

Download Method Statement for Installation of Canopies

Download Method Statement for Installation Of Canopies  Download Package Contains the Method Statement + Checklists for Installation + Inspection & Testing Plan + Risk Assessment You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients. Below is the list of files that are included in […]

Download Method Statement for Installation of Canopies Read More »

Civil Works Method Statements
Method Statement For Installation Of Automatic Aluminium Sliding Door

Download Method Statement for Installation of Aluminium Sliding Doors

Download Method Statement for Installation Of Aluminium Sliding Doors  Download Package Contains the Method Statement + Checklists for Installation + Inspection & Testing Plan + Risk Assessment You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients. Below is the list of files that are included

Download Method Statement for Installation of Aluminium Sliding Doors Read More »

Aluminium & Glass Work Methods, Civil Works Method Statements
Installation of Fencing

Method Statement for Installation of Fencing

Following Plant & Equipment to be arranged for the project fencing work. Tracked excavator Tractor and trailer Post driver Chainsaw Small tools (hammers, nail guns, wire cutters etc.) All personnel entering the site shall have received site safety induction and have attended a job toolbox talk. The Fencing Site Engineer will issue a Permit to Dig

Method Statement for Installation of Fencing Read More »

Civil Works Method Statements
aluminium handrail stair railing

Download Method Statement for Installation of Aluminium Hand Rails

Download Method Statement for Installation Of Aluminium Hand Rails  Download Package Contains the Method Statement + Checklists for Installation + Inspection & Testing Plan + Risk Assessment You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients. Below is the list of files that are

Download Method Statement for Installation of Aluminium Hand Rails Read More »

Aluminium & Glass Work Methods, Civil Works Method Statements

Download Method Statement for Installation of Aluminium Cladding Works

Download Method Statement for Installation of Aluminium Cladding Works  Download Package Contains the Method Statement + Checklists for Installation + Inspection & Testing Plan + Risk Assessment You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients. Below is the list of files that

Download Method Statement for Installation of Aluminium Cladding Works Read More »

Civil Works Method Statements
Pipe Jacking Method Statement Using Automatic Tunneling Machine

Pipe Jacking Method Statement Using Automatic Tunneling Machine

The objective of this method statement is to define the installation sequence of casing pipe by means of Pipe Jacking using Herrenknecht Automatic Tunneling Machine with Slurry Material Removal (AVN machines). Table of Content Soil investigation. Identification and location of existing utilities. Responsibilities Labor, equipment’s and material required to complete the work. Handling and disposal

Pipe Jacking Method Statement Using Automatic Tunneling Machine Read More »

Civil Works Method Statements

Method Of Statement For Structural Excavation & Backfilling

Excavation and Backfilling for Culverts, Storm Sewers and Ducts Precast concrete and steel pipe culverts and pipe ducts will be installed in trenches cut into previously constructed and compacted embankment either from the subgrade or from an embankment height at least twice the nominal diameter of the pipe. Unless otherwise noted on the drawings, trenches

Method Of Statement For Structural Excavation & Backfilling Read More »

Civil Works Method Statements
error: Content is protected !!
Scroll to Top