Method Statement for Civil Works

Method statement for civil works is very important for the building construction works.

These documents are used for approval of the civil construction works.

In order to start a construction activity method statement for building construction should be prepared and submitted for approval.

Click here to download complete set of civil work method statements.

Below is the list of method statements for civil works that you can check by scrolling down and then visiting other pages as well.

You can search a specific civil method statement from search box on right side of this page.

Installation Of Passenger’s Elevator Hooks, Hook Beams & Divider Beams

Prior transferring materials from lay down, the foreman shall make a materials inventory at the lay down area as per approved shop drawings if the all materials required for the passenger’s elevator hooks, hook beams and divider beams are all available at site. If found the materials available at site, the foreman shall take permission […]

Installation Of Passenger’s Elevator Hooks, Hook Beams & Divider Beams Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements
Filling-Core-Sonic-Pipes

Procedure for Filling Core Sonic Pipes

The following describes the procedure for filling core sonic pipes with cement grout. Prepare the mix as per the proposed mix design given below using following equipment’s: Mixer Piston Pump Grout hose of suitable length Grout Mix Design For Filling Core Sonic Pipes For Grout Strength 30N/mm2 Mix  Design OD Weights MSRC (Type II) 1420 kg/m3

Procedure for Filling Core Sonic Pipes Read More »

Civil Engineering Methods, Method Statement for Civil Works
Temporary-Retaining-Wall-Installation-Method-Statement

Method Statement for Temporary Retaining Wall Installation

The existing ground level varies between + 3.52 m DMD to + 4.29 m DMD. The working platform level for Double U wall is considered at the average ground level. A Double U channel beam wall with one layer of tie-back anchors shoring system is proposed along the four sides of the plot for a

Method Statement for Temporary Retaining Wall Installation Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works
Piling Cage Installation

Method Statement for Pile Reinforcement and Concrete Casting

Subsequent to the completion of the pile drilling, the borehole depth will be checked and verified versus the depth given on daily piling sequence and pile data.  Only after borehole depth check can the cage be lowered into the borehole.  A reference site datum level will be given to ensure the correct positioning of the

Method Statement for Pile Reinforcement and Concrete Casting Read More »

Civil Engineering Methods, Method Statement for Civil Works

Method Statement for Piling Works Constructions – Drilling

Below is a brief method statement of piling work that can be used for any kind of project piling works. A crawler mounted piling rig will be used to install bored cast in situ piles of dia 1200 mm. The procedure for the construction of bored piles, with temporary casing under bentonite / water  support

Method Statement for Piling Works Constructions – Drilling Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements

Internal Painting Method Statement

This method statement details general procedures to be followed for the internal painting work using paints from Berger at any kind of a project/building. The procedure covers preparatory works, actual application and area cleaning associated with the painting works. For Latex Emulsion Paint the sequence will be: Surface Preparations -> PVA primer 1 Coat ->

Internal Painting Method Statement Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements

Method Statement For Repairing Screed Surface

Following equipment shall be arranged: Hand tools Air Compressor Wire brush Slow speed drill with Fosroc MR4 mortar mixing paddle Finishing Sponge & rubber gloves SURFACE PREPARATION Mark out the defective area, remove loose sand cement materials and all contamination from screed  such as dust, oil & grease if any up to the perimeter of

Method Statement For Repairing Screed Surface Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements