This method statement covers on site installation of noise control and vibration isolator equipment associated with all rotating, centrifugal and reciprocating equipment i.e. pumps, chillers, air handling units and pipe connections etc. Procedure defines the steps that will be used to ensure
Read Complete Method
Kidde Argonite® Fire Protection Systems are clean agent, automatic fire extinguishing systems that use Argonite (IG-55) and consist of four basic components and their associated accessories: • Argonite Cylinders and Components, • Completer Kits, • Control Panels, • Detection and Alarm Devices.
Read Complete Method
Below you can find a precise method of statement for fire suppression system testing & commissioning applicable for any kind of clean agent system. The scope of method statement covers the planning, preparation and conduct of fire suppression system testing and commissioning.
Read Complete Method
The aim of chilled water balancing in chilled water system is to apply a disciplined procedure of adjustments to water flow rates throughout the chilled water system to meet the particular requirements of the design. Chilled water balancing in hvac system for
Read Complete Method
Below is a precise air balancing procedure that covers the HVAC system equipment and ducting system. Air Balancing For Fan Coil Units Check that all automatic controls are fully commissioned and operating properly All pre-commissioning checks have been carried out Select the
Read Complete Method
Project Manager is the overall responsible person for the process implementation of the works. Construction Manager/Site Engineer will be responsible for all construction activities at the site and will directly supervise through erection supervisor/ skilled workmen the work at site. Site Engineer
Read Complete Method