Automatic Transfer Switch & Bypass Isolation Switch Testing & Commissioning

The purpose of this electrical method statement is to outline the sequence & method of Testing & Commissioning of Automatic transfer & Bypass isolation switch. This procedure is to be read in conjunction with relevant ATS operators manual and User’s guide. By following this procedure contractor shall ensure that the method used for testing and… Read More »

Underground Piping Fabrication and Laying Method Statement

Purpose of this mechanical work procedure is to provide guide lines to carry out underground piping fabrication and laying and to ensure that proper quality control and documentation are maintained at project site. The scope of this procedure covers fabrication, installation and relevant inspection for all underground piping works including relevant civil works at the… Read More »

Building Management System BMS Installation Testing and Commissioning Method Statement

Below is a precise and best method of statement that is applicable for installation, testing & commissioning of BMS building management system in accordance with the specified standards and regulations in project specifications. The scope of works includes the delivery to site, installation, testing & commissioning of the BMS system as described in the project… Read More »

METHOD STATEMENT FOR INSTALLATION OF WIRING DEVICES & CEILING ROSE

The purpose of generating this method statement is to define the procedure step by step to implement the correct practices for installation of wiring devices & ceiling rose for electrical system through the guidelines contained herein so as to ensure that the job execution complies with the requirements of contract specification and serves the intended… Read More »

Method Statement for Piping Fabrication and Installation

This document covers the sequence of activities for Fabrication, Erection and Installation procedure for Metallic Piping (Carbon Steels, Stainless Steels, Nickel Alloys) systems and to ensure the compliance to the above activities with the contractual applications, applicable standards and HSE requirements. Below is list of necessary equipment’s and tools for the piping fabrication and installation… Read More »

Roof Cladding | Wall Cladding Method Statement

Below is a precise method statement for installation of insulated roof cladding and wall cladding installation. List of necessary plant, machinery, materials and tools: Lifting Equipment 50 ton mobile crane (2 No.) 25 ton mobile crane (4 No.) 3 ton telescopic boom loader Scaffoldings Man lift Electrical equipment Generator Drill (110 volts) Screw gun Electrical… Read More »

Civil Method Statement for Pond Work

This civil Method Statement defines the procedure to carry out the pond work as per requirements in project specifications to ensure the safety and quality of the work. Method statement covers excavation activity, rebar installation, formworks, concrete pouring, curing of concrete, formwork dismantling, finishing, and other civil work base on civil work item list. Subcontractor… Read More »

Sample Forms & Checklists For HVAC Installation Testing & Commissioning

You can download the sample forms and checklists for different activities which you can then reuse and customize as per your requirements. Below we have given list of checklists which you can download in one go by clicking the download link given below at the end of the list. Installation-of-HVAC-Duct-Work-System Installation-of-Internal-Lighting Installation-of-Lightening-Protection-System Installation-of-HVAC-Damper-Louver-and-Accessories Installation-of-Fans-and-Accessories Installation-of-Exposed-Conduit… Read More »